Laserfiche WebLink
Site Safety and Health Plan • • <br /> UST Removal Project <br /> ABF Freight System,Inc. <br /> Manteca,California Page 17 <br /> • <br /> • Sampling equipment will be brushed clean and rinsed with distilled water or other <br /> appropriate cleaning material. <br /> • Samples will be dry-wiped prior to packaging. <br /> 5.7.3 Heavy Equipment <br /> All heavy equipment that comes in contact with contaminated soil during the excavation work <br /> will be pressure washed after all excavation and backfill activities are complete. <br /> 5.7.4 Decontamination Wastes <br /> • Spent decontamination solutions may be required to be drummed and disposed of as <br /> hazardous waste and/or solvent solutions may be required to be segregated from water rinses. <br /> • Decontamination will be performed in a manner that minimizes the amount of waste <br /> generated. <br /> 5.8 Procedures for Waste Handling of Anticipated Wastes <br /> • 5.8.1 Waste Generation <br /> Expected Volume of solid 60 CY <br /> Expected Volume of liquid <200 Gallons <br /> Potential Characteristics: <br /> Corrosive Ignitable Reactive Toxic x <br /> Petroleum x Metals Solvents Other <br /> Other(SYPCi Ar <br /> 5.8.2 Storage and/or Treatment Methods Proposed: <br /> • This project will x will not— generate hazardous wastes. <br /> The UST will be disposed as a RCRA Hazardous Waste. Contaminated soil and water are <br /> anticipated to be non-hazardous. <br /> • • These wastes will be (1) temporarily stored* in the following manner(s) and stored <br /> within secondary containment: <br /> \\SERVERI\C-DRIVE\PROJECTS\3272\Plans and Reports\Site Safety Health Plan.doc February 10, 1998 <br />