Laserfiche WebLink
• HAZARD* IALYSIS PA* OF 3 <br /> UST REMOVAL PROJECT 8400 -96- -004 <br /> FEATURE BACKFILL AND COMPACTION ANALYZED BY/DATE REVIEWED BY/DATE <br /> EQUIPMENT INSPECTIONS TRAINING <br /> TO BE USED REQUIREMENTS REQUIREMENTS <br /> Backhoe daily equipment <br /> inspections <br /> --------------------------------------------------------------- --- --------------------------- <br /> Loader dailyequipment <br /> inspections <br /> - ------------- ------Y--4u----------------- ------------------------------ ---- -------------------- • <br /> Roller dail e i ment <br /> inspections <br /> --------------------------------------------------------------- - <br /> Nuclear Density daily equipment <br /> Gauge inspections <br /> performance test read and verify crane load chart <br /> verify range of operations - boom, swing, hoist, travel <br /> verify footing (soft soil, uneven surfaces, obsticles) <br /> verify overhead limits (power lines, trees, aircraft operations) <br /> • <br />