Laserfiche WebLink
F. In-Tank Gauging I SIR Equipment: X Check this box if tank gauging is used only for inventory control. <br /> - Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Yes No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Yes No` Were all tank gauging probes visually inspected for damage and residue buildup? <br /> - Yes No' Was accuracy of system product level readings tested? <br /> ` Yes No' Was accuracy of system water level readings tested? <br /> Yes No' Were all probes reinstalled properly? <br /> S Yes _ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): i.. Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> Yes No' For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? (Check all <br /> N/A that apply) Simulated leak rate: 7,3 g.p.h.; 10.1 g.p.h; -0.2 g.p.h. <br /> Yes NW Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes ❑ No' Was the testing apparatus properly calibrated? <br /> Yes ❑ No' For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ WA <br /> Yes No' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> Yes = No' For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> WA disconnected? <br /> Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> ❑ N/A fails a test? <br /> Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A <br /> Yes - No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: PER SR0065990 CPU BOARD WAS REPLACED EARLIER AND ALL NOW CONFIRMED WITH COUNTY <br /> TO BE OPERATING AS DESINED <br /> Monitoring System Certification Page 3 of 4 12W <br /> 4 2)21)07 <br />