My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1985-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
853
>
2300 - Underground Storage Tank Program
>
PR0231460
>
COMPLIANCE INFO 1985-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 2:52:58 PM
Creation date
11/8/2018 10:04:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2006
RECORD_ID
PR0231460
PE
2381
FACILITY_ID
FA0001369
FACILITY_NAME
7-ELEVEN INC. STORE #21756
STREET_NUMBER
853
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
853 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\Y\YOSEMITE\853\PR0231460\COMPLIANCE INFO 1985-2006.PDF
QuestysFileName
COMPLIANCE INFO 1985-2006
QuestysRecordDate
8/10/2017 4:54:42 PM
QuestysRecordID
3567749
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPERATING POSITIONS <br /> 1 a! <br /> Full Pump \ \ Full Pump \� full Pump <br /> re <br /> MONN <br /> 04 psi P i \ \�\��V Full Pump\1 \ ' <br /> Pressure <br /> was` � °vr <br /> POSITION 1 - Position 1 is the POSITION 2 - When pressure POSITION 3 - If the <br /> "tripped" or"reset"position. The in the delivery system has pressure continues <br /> '96 LD-2000 goes into this posi- reached 12-15 psi, the piston to rise, the"96 LD- Gym <br /> tion when the pressure in the and poppet assembly moves to 2000 will move to <br /> delivery system falls to 4 psi or Position 2 - the "leak sensing" Position 3 - the "full <br /> less at the leak detector. position. flow" position. In <br /> position 3, the '96 <br /> ''.n the reset position, the '96 LD- As the poppet moves to this LD-2000 will allow <br /> .000 is ready to look for a leak —position, the cross hole in the M flow of product <br /> in the delivery system the next poppet centers around the head from the sub- <br /> time the submersible pump is in the metering pin. Since the mersible pump to <br /> tamed on. With the pump head of the pin is considerably enter the delivery <br /> turned on, the '96 LD-2000 will larger than the shaft, flow is system. <br /> allow approximately 1.5 gallons restricted from 1.5 GPM to 3 <br /> of product per minute to enter GPH or less. <br /> the delivery system through a <br /> cross hole in the poppet. If there is a leak in the delivery <br /> system of 3 GPH or more, the <br /> In Position 1, a portion of the pressure in the delivery system <br /> cross hole is positioned around will not rise, and the '96 LD- <br /> the narrow part of the metering 2000 will stay in this_position. If <br /> pin. Pressure will build very there is no leak in the delivery l <br /> quickly to 12-15 psi. As the system, the pressure will con- <br /> pressure builds in the delivery tinue to rise. <br /> system, it also increases under <br /> the piston in the top of the '96 <br /> LD-2000. This pressure causes \ <br /> the piston and poppet to move <br /> upward. <br /> For further information about the '96 LD-2000 or other leak detection equipment, <br /> contact your local distributor or call: <br /> VAPORLESS MANUFACTURING,, INC. <br /> 9234-C East Valley Road - Prescott Valley, AZ 86314 <br /> 1-800-367-0185 - (520) 775-5191 - FAX (520) 775-5309 <br /> t As Printed on Recycled Paper Made in the United Stales of America <br />
The URL can be used to link to this page
Your browser does not support the video tag.