Laserfiche WebLink
l • <br /> LMr.MichaeTKith <br /> June 5, 1998 <br /> GROUP INC. Page 2 <br /> Tank Equipment Installation <br /> • 3 sets of plans(1 set wet stamped/signed) <br /> • Service Request Worksheet <br /> • Underground Storage Tank Program—Fee Worksheet <br /> • A check for the amount of$980.00,application filing fee(Attached to Fee Worksheet) <br /> • Application for UST Installation Permit <br /> • CWRCB Form A and B <br /> • Contractors Licenses,Insurance, and Certifications <br /> • Monitoring and Response Plan <br /> • Three Sets of Equipment and Materials Specification Sheets <br /> Note: Shoring requirements will be determined on site, see sheet FSP-2, Section III, Part 3, <br /> Note 3.7. <br /> If you have any questions or require additional information please feel free to contact me. <br /> Sincerely, <br /> RHI Design Group,Inc. <br /> Debbie Herzog <br /> Project Administrator <br /> Enclosures <br /> cc: Mr.Paul Parham, Southland Corporation <br /> Mr.Bob DeNinno, Southland Corporation <br /> F\ftope a�.Nnd'30M.20\DEH-M <br /> BELLEVUE, WA LA HAE RA, CA SACRAMENTO, CA SCOT T S DAL E, AZ <br />