My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO 2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 4:48:12 PM
Creation date
11/8/2018 10:21:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS3\G\GRANT LINE\3250\PR0518288\COMPLIANCE INFO 2006-2012.PDF
QuestysFileName
COMPLIANCE INFO 2006-2012
QuestysRecordDate
7/5/2017 10:08:33 PM
QuestysRecordID
3482644
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> D. Results of Testing/Servicing <br /> Software version Installed: 328.02 __— <br /> Com tete the followi ebeeklist: <br /> x Yes ❑ No* Is the audible alarm operational? <br /> x Yes ❑ No` Is the visual alarm operational? <br /> x Yes ❑ No' Were all sensors visually inspected,fulmctbnally tested,and confirmed operational? <br /> x Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> x Yes ❑ No' If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) <br /> 3 NfA operational? <br /> T Yes ❑ No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> N/A monitoring system detects a leak, fails to operate,or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) x Sumpfrrench Sensors; E]Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks Md sensor failureldisconnection? x Yes; ❑No. <br /> x Yes ❑ No' Fnr tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no <br /> p N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly9 if so,at what percent of tank capacity does the alarm trigger? 90 <br /> Yes* x No Was any monitoring equipment replaced? If yes, identify specific sensors, probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes- x No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product: O Water. If yes,describe causes in Section E,below. <br /> x Yes ❑ No' Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> x Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> ' In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Page 2 of 3 <br /> 1!Y-036-214 "w .uddurxMg Rev.0126/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.