My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO 2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 4:48:12 PM
Creation date
11/8/2018 10:21:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS3\G\GRANT LINE\3250\PR0518288\COMPLIANCE INFO 2006-2012.PDF
QuestysFileName
COMPLIANCE INFO 2006-2012
QuestysRecordDate
7/5/2017 10:08:33 PM
QuestysRecordID
3482644
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page �? of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: D Piping Manufacturer D Industry Standard D Professional Engineer <br /> D Other(Specify) <br /> Test Method Used: D Pressure D Vacuum D Hydrostatic <br /> D Other(Specify) <br /> Test Equipment Used:Dial Gauge Equipment Resolution:0-15 psi <br /> Piping Run# V R Piping Run# Piping Run# Piping Run# <br /> Piping Material: <br /> Piping Manufacturer: S' <br /> Piping Diameter: " <br /> Length of Piping Run: .2 e> <br /> Product Stored: <br /> Method and location of Test boot in sump Test boot in sump Test boot in sump Test boot in sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(R>):__ <br /> Test End Time: <br /> Final Reading(RF): S 1p S! <br /> Test Duration: I hour I hour 1 hour 1 hour <br /> Change in Reading(RF-Rr): <br /> Pass/Fail Threshold or <br /> Criteria 0.00 0.00 0.00 0.00 <br /> Test Result: Pass D Fail D Pass D Fail D Pass D Fail D Pass D Fail <br /> Comments— include inform ation on repairs made prior to testing, and recommenAg4q1tow-up forfailed tests <br /> /Z�7 rQ OT -i•5 X -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.