Laserfiche WebLink
BCE#10050 <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES)4 NO[j <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan"is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, LIDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> -ACCESS BOTH EXISTING 87 TANK TURBINE SUMPS(NO GROUND BREAKING).INSTALL AN ELECTRONIC PRESSURE LINE LEAK <br /> DETECTOR(PLLD)AT EACH. <br /> ACCESS EXISTING 91 TANK TURBINE SUMP(NO GROUND BREAKING).INSTALL AN ELECTRONIC PRESSURE LINE LEAK DETECTOR <br /> (PLLD). <br /> CALIBRATE AND SET UP EXISTING VEEDER ROOT SYSTEM AND PLLD IN ACCORDANCE WITH MANUFACTURERS SPECIFICATIONS <br /> AND COSTCO'S STANDARDS. <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-parry approval): <br /> Veeder-Root#848480-001 Pressure Line Leak Detectors <br /> 2 <br /> 10050.004-pdf.doc <br />