|
° 9 F `
<br /> U)
<br /> c. ra T CAUTIONF
<br /> o
<br /> µ
<br /> GRANT UNE RD UTILITY CONFLICT NOTE:
<br /> F RC JE:C T
<br /> LOCATION , THE CONTRACTOR SHA L_ BE RESPONSIBLE FOR VERIFYING THE LOCATION DIMENSICO
<br /> AND DEPT11 OF' ALL EXISTING UTILITIES WHETHER SHOWN ONTHESE PLANS OR N07
<br /> \` '', a _ r
<br /> 0. —SITE ��, � ,,��
<br /> ��' BY F 0.1.-HC)L_fNG rfIE. UTILITIES ANL? SURVEYING THE HORIZONTAL., AND VERTICAL- GENERA � �
<br /> LOCATION PRIOR FO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE @ 1
<br /> (800) 22-7---2600 AND THEN POTHOLING A(._P_. OF THE EXISTING UTILITIES AT LOCATIONS
<br /> OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS
<br /> EXISTING 2" FLEXIBLE DOUBLE WALL, PRODUCT PIPING IN 4" GEODUCCT
<br /> 1.: EXIST, LOCATIONS OF' SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED d.JPON _.
<br /> EXISTING 2" OR 3" F",C, DOUBLE WALL_ VAPOR RECOVERY PIPING re
<br /> _x
<br /> cy-
<br /> THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION, IF CONFLICTS
<br /> °'"" _ SHOULD OCCUR, ]"HE CONTRACTOR SHALL CONSULT BARGHAJSEN CONSULTING
<br /> EXISTING 3 DC)1.1F1_E WALL_ FIBERGLASS VE:N T PIPING
<br /> C) I � ` '"
<br /> ENGINEERS,
<br /> INC, TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH 1. PRODUCT, VAPOR AND VENT" PIPING SLOPES TOWARD TANK
<br /> NOT TO SCALE CONS f Rl)C I PON. I/E3"" PER Faa MINIMUM. IC�NON 1 IPING L_C)PEMG 1/ INCH PER FaC)1m.
<br /> NOT 1'C SCALE Uj
<br /> 2. SECONDARY CONTAINMENT PIPING IS SHOWN BY NOTE ONLY,
<br /> VICINI'rY MAP LOCATOR MAPNOT GRAPHICALLY, ALL PRODUCT, VENT AND VAPOR RECOVERY PIPING IS DOUBLE �
<br /> Of CL 0 0 co
<br /> r
<br /> CONTAINMENT PIPE. PRODUCT PIPING IS ROUTED TERTIAR ONTAINMENT DUCT, L._
<br /> . i
<br /> LL-1
<br /> LL 0
<br /> <.") _ to
<br /> 04
<br /> ' -
<br /> CJ
<br /> TANK AND PIPING
<br /> -THREE THREE 20,000 C� FIBERGLASS
<br /> AI_.l_C�N DaIwJF�I_C: �NAL..L_ FpE�E:RGL.AS.� TANKS WITE`� HYDROSTATIC ANNULAR SPACE
<br /> MONITORED BY "VEEDER ROOT" _TLS350 -TANK AND PIPING MONITORING AND ALARM SYSTEM TO REMAIN,
<br /> Q_2 EXISTING ONE (1) F.E. PETRO IST 2 HP VAPJABL.E SPf=F'D TURBT _
<br /> _. THE PRIMARY � a,aC?a GAI._I..ON 7
<br /> OCTANE NK (-TANK F N
<br /> UNLEADED T_A K #1) FO R!_. ,IN. EXI, AG ONE (1)I F".E". PETRO IST 2 HFA VARIABLE SPEED
<br /> TURBINEIN THE. PRIMARY 30,000 GALLON 87 OCTANE UNLEADED TANK (TANK #2) TO REMAIN, THE 87
<br /> �
<br /> TURBINES ARE: CONFIGURED AND SET S UP A::a
<br /> -
<br /> (MASTER/MASTER CONFIGL_JRATION), AND SHALL BE EACH -
<br /> �4
<br /> f
<br /> INDIVIDUAI_..I_.Y EQUIPPED WITH AN ELECTRONIC PRESSURE LINE LEAK DETECTOR (PLLD)• EXISTING ONE (1) 2 HP
<br /> _
<br /> VARIABLE SPEED -TURBINE IN ..THE 92 OCTANE TANK TO REMAIN..
<br /> EXIS ING 3" INSIDE 4" FRP STAGE II VAPOR RECOVERY HEADER � T 1,
<br /> �,1
<br /> ` FOR VAPOR REG AND 2°" INSIDE 3" BRANCHES TO DISPENSERS 661 ° I
<br /> RECOVERY SYSTEM -TO REMAIN. f; T
<br /> ta EXISTING 2" "ENVIRON GEC)1=L_.EX D FLEXIBLEDOUBLE WALL PRODUCF LINES TO REMAIN. EXISTING LINES ARE
<br /> 6/30 i
<br /> INSTALLED IN 4 ENVIRON GEODUC T . LINES ARE EQUIPPED WITH LIQUID LEAK MONITOR SENSOR IN PIPING �� � � V
<br /> I f,,.,.,
<br /> SUMP ATTACHED TO TANK AND WIRED FOR TURBINE SHUT DOWN. -
<br /> as ... A� `
<br /> re _ BUILDING E ALARM CONTROL_ PANEL_ MODEL # TL.S__�35a IN EQUIPMENT _.
<br /> " F XISTPNC:y "VEEDER ROOT" TANK AND LINE
<br /> ENCI__OSURE G TO REMAIN, INSTALL NEW PRESSURE LINE LEAK INPUT AND OUTPUT MODL.ILES
<br /> " EXISTING
<br /> 3" DOUBLE WALL._ FIBERGLASS VENT LINE TO REMAIN.
<br /> 7- EXISTING (b) SIX DISPENSERS TO REMAIN,
<br /> FUNCTIONAL
<br /> ("
<br /> ELEMENT
<br /> f' ; ,
<br /> J
<br /> 1
<br /> I) fir, I
<br /> r
<br /> f o
<br /> 11�
<br /> TANK #3
<br /> 01 OCTANE) I -
<br /> 1 � I
<br /> GALLON
<br /> LL NEW PLLD ��
<br /> 1
<br /> r
<br /> \4
<br /> uW \, (
<br /> VErvEDE�R---"BOGY 4t ��a—G01 _..._, \\ � <)
<br /> \ TANK '
<br /> 1
<br /> w
<br /> TING PRODUCT MANIFOLD T ) REMAIN
<br /> (S%` OCTANE) ,0>Ga0(NORMALLY CLOSE FUNCIONAFELEMENT,
<br /> � p w
<br /> �
<br /> GALLON
<br /> REMOVE
<br /> S[DI"RING
<br /> EXISTING 2" INSIDE 3" frtRP ;.3
<br /> EXISTING " INSIDE T" AND PISTON.
<br /> �r`r c�
<br /> ACTIVE SIPHON TO REMAIN �`---�---�� �_ � �� 1
<br /> UC TANS ' '` E_XIS-TING TRANSFORMER �..'_. I
<br /> E
<br /> O,aa0 �
<br /> C)D '' F�UNC TIONA R
<br /> GALLON
<br /> ,.�� E L..I m�fVl F N��1 �
<br /> I I
<br /> 0
<br /> VAvFw
<br /> _.
<br /> _
<br /> _. - 3' DIA, BLACK STEEL VENTL_ NEW PL ... r RISER TO REMAIN
<br /> I i
<br /> r
<br /> VEEDER
<br /> #848480-001 -
<br /> r'
<br /> E 3" INSI[ E 444 ,
<br /> oa r.,. -- EXISTING VEEDER ROOT ALARM
<br /> ` M NI FOR SYSTEM TO REMAIN
<br /> �7
<br /> EXISTING CONTROLLER
<br /> 2" INSIDE 4"
<br /> EXISTING DISPENSERS TO REM AlI\L ENCLOSURE:
<br /> ('
<br /> 4—
<br /> 1 YF"'. OF 6) � -
<br /> — EXISTING EMERGENCY PUMP
<br /> =r-
<br /> SHUTOFF SWITCH
<br /> _71N
<br /> „_ _ X4.7
<br /> ROOT PLLD _ v
<br /> _ �r
<br /> __.____......____ -,_.........
<br /> .__.._,
<br /> .............................. ...... .......................
<br /> 1,x'`8" PER FT. 1/8a, PER F
<br /> Id .TL _..,_:
<br /> EXISTING EMERGENCYF'l_1MP q{ -
<br /> ",�_h
<br /> w
<br /> SHUTOFF SWITCH .
<br /> C`� _._...--.
<br /> EXISTING HORIZONTAL E-FALY CAS
<br /> Ell
<br /> UNI Ts CJ
<br /> 0 i C7
<br /> . INSIDE 4" 3`p INSIDE 4°" r
<br /> _
<br /> _ ca CLo
<br /> a*
<br /> INSIDE 4„ 1/8" �
<br /> ......, ,.,........_ N
<br /> f INSIDE 4" 1/8" N
<br /> PER FT. PER FT. T
<br /> t�
<br /> 9l -a 1/8" PER F T.
<br /> E.XISTINC,
<br /> 1,/8_ PER F�1 .
<br /> ~0
<br /> TREE. TO
<br /> REMAIN
<br /> :>
<br /> 12 11 _ ___ .
<br /> 8 . _ _ Ld
<br /> _
<br /> 3 : Z
<br /> _ _ ............. __
<br /> CL
<br /> ..... ` L 1
<br /> _.._
<br /> " 00 z
<br /> c-) NI (5�r
<br /> 00 Cry
<br /> C3a I P z
<br /> �; cr
<br /> \j . �a
<br /> Ln Ln z
<br /> L) L ')
<br /> " 1.0 If) u)
<br /> CID LU mho „'t _ _-� r�.7
<br /> r
<br /> I 1
<br /> t
<br /> I
<br /> z cz:
<br /> w I
<br /> &
<br /> (T)
<br /> N
<br /> g a
<br /> E
<br /> mT /.x r J F x —
<br /> C 6 Uj
<br /> 22
<br /> U
<br /> UNDERGROUND TANK AND PIPING SITE PLAN
<br /> ° s .,_..
<br /> THIS `LITE PLAN HAS BEEN PREPARED tNTTF1011T BENEFIT OF TITLE REPORT, SURVEY, OR �n ��� V) I
<br /> � I
<br /> LEGAL DESCRIPTION, ETARGI-IAUSE�N CONSULTING ENGINEERS `
<br /> Call Toll Frei INEE.RS DOES NOT WARRANT THE �'�� 31I
<br /> 0
<br /> ACTUAL LOCATION OF PROPERTY LINES AND SETBACKS NOR THE LOCATION OF' EXISTING 3
<br /> (JNDEmEGRaI.,JND PIPING AND EQUIPMENT, IT !C; THE RESPONSIE31(...ITY aF THE INSTAI_L..INGm
<br /> "
<br /> FOR ISD INSTALLATION SCALE: ,,,mm P ,.. r i s
<br /> LO
<br /> (800) 332-2344
<br /> _....,.,,..,._._...,.... r. 7 n
<br /> T CON TRACCTOR TO VERIFY PROPERTY I_INE:S AND SETBACK DISTANCES WI-TERE THEY MAY �"
<br /> 0 5 10 20 6 DAYS AFFECT THE PLACEMENT OF NEW EQUIPMENT AS A PART OF _FFJIS PRO EC T6-9E DRAWBEFORE ING � �t `'� to ra L �
<br /> ______._ .___.._ _.v DIG REFLECTS EXISTING SITE CONDITIONS AS PROVIDL2D BY C;OSTCO FROM ARCHIVE_ RECORDS, .aZZ, �' 8 '
<br /> !77)
<br /> CD_
<br /> V)
<br />
|