My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO 2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2021 4:34:29 PM
Creation date
11/8/2018 10:21:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS3\G\GRANT LINE\3250\PR0518288\COMPLIANCE INFO 2013-2015.PDF
QuestysFileName
COMPLIANCE INFO 2013-2015
QuestysRecordDate
7/5/2017 11:14:25 PM
QuestysRecordID
3483232
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Replacing the ECPU <br /> Board <br /> Important!All operating,setup and historical data will be lost when the console is turned off and the <br /> ECPU board is replaced. <br /> 1. Perform the "Archiving the System Setup Into the EEPROM Chip" on page 4. <br /> 2. Switch Off power to the Console. Open the left front door of the console. Follow the steps in Figure 1 to <br /> Fremove the ECPU board. <br /> 3. Place old and new ECPU boards side by side on a clean work surface. Make sure that the Battery Backup <br /> switches on both boards are turned Off. <br /> 4. Using a chip removal tool similar to the one shown (IC Extraction tool, Digikey Part No. K158-ND, or <br /> equivalent), follow the steps outlined in Figure 4 remove the E2 chip from the old ECPU board and install it the <br /> identical socket on the new board reversing the procedure shown in Figure 4. Observe chip orientation as <br /> shown in Figure 5. <br /> 5. Remove the SEM module from the old board and install it in the SEM socket of the new board (ref Figure 10 <br /> on page 17). Note: Either type SEM will only plug in one way. <br /> 6. Remove the software module from the old ECPU board and install it on the new board (ref Figure 8 on <br /> page 14). If present, also remove the memory module from the old ECPU board and install it on the new <br /> board. <br /> Disconnect each of the <br /> three cables attached _ <br /> to the ECPU board. <br /> ECPU Board Installation <br /> guide slots(one at top and <br /> bottom). <br /> Pull the board straight out until you disconnect <br /> it from the motherboard connector and it clears <br /> the top and bottom guides. Rotate it towards <br /> you to clear the door. Hold the ECPU board by <br /> its edges and avoid touching components and <br /> connector pins. <br /> o <br /> w <br /> Pull up on corner j, Remove the grounding wrist <br /> of board with your / strap from its package and <br /> finger ((2 wrap one end around your <br /> 4 Pry the board wrist. Ahere the other end <br /> off of its retention pin 3 retention to the side of the comm board <br /> pins. cage. <br /> 7 Turn OFF ac power to the 1 console. Push SWl down to turn <br /> battery backup OFF. 07 <br /> o <br /> Figure 1. Removing the ECPU Board <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.