Laserfiche WebLink
5, SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer M Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Me.tliod Used: M Pressure p Vacuum ❑ Hydrostatic <br /> ❑ Other(Specjfi) <br /> Test Equipment Used: Test reducer boats,air:cornpressor and gauges Ecluipinea Resolution: 0.51/o of span. <br /> ��87A 8713 91 A 91 B <br /> Piping Material: Plastic Plastic Plastic Plastic <br /> Piping Manufacturer; Environ Environ Environ Environ <br /> Piping Diameter; 2" 2" 2" 2" <br /> Length of Piping'Run: 160' 190' 190' 160' <br /> Product Stored: 87 87 91 91 <br /> Method and location of <br /> i in -run isolation: Reducer Boots/Fittings Reducer Boots/Fittings Reducer Boots/Fittinga Reducer Boots/Fittings <br /> Wait tii:ne between applying <br /> pressure/vacuum/water and 10 Minutes 10 Minutes 10 Minutes 10 Minutes <br /> starting test: <br /> Test Start Time: 11:20 AM 11:20 AM 11:20 AM 11:20 AM <br /> Initial Reading(RI): 5 5 5 S <br /> Test End Tune: 12:20 PM 12:20 PM 12:20 PM 12:20 PM <br /> Final Reading(RF).: 5 5 5 5 <br /> Test Duration: 60 Min 60 Min 60 Min 60 Min <br /> Change in Reading(RF-RI): 0 0 0 0 <br /> Pass/Fail Threshold or <br /> Criteria: No Detectable Lass No Detectable Loss No Detectable Loss No Detectable Loss <br /> Test Result: Pass Pass Pass Pass <br /> Comments— (include inforination on repairs made prior to tesin , and yeCoitntrerrrled oJloiv-u or ailed tests) <br /> KEE��� <br /> f2LI <br /> EavlRogMfjjTAL HEALTH <br /> - �PERMITISE - -. <br />