Laserfiche WebLink
Thuy Tran [EH] <br /> From: Briana Armstrong<BArmstrong@barghausen.com> <br /> Sent: Friday, May 24, 201310:56 AM <br /> To: Thuy Tran [EH] <br /> Cc: dbock@costco.com;John Ellingsen;Alexia Inigues; Chris Tebaldi; File <br /> Subject: Lubrizol additive Training Log-Tracy Costco#658 Fuel Additive install/BCE#10050 <br /> Attachments: 10050-F-Training Log-Fuel Additive-2013-05-22-Completed.pdf <br /> Importance: High <br /> Thuy, <br /> Thank you for calling me yesterday about the training log for the fuel additive system. <br /> I have attached a copy of the Training Log signed by Tony Sleugh with Costco Gasoline Operations who conducted the <br /> training.An unsigned copy of the log was actually in the data but yesterday for the final inspection, but it had not been <br /> placed in the binder with the other documents. <br /> As soon as we receive the signed Certification of Installation from the contractor,we will make the final submittal in <br /> CERS.Once you receive the ELD test results and the CERS submittal,you will issue the approval to operate the tank, <br /> correct? <br /> Please let me know if you have any questions or need additional information. <br /> Thank you! <br /> Briana <br /> ------------------------- <br /> Briana L.Armstrong,Assistant Planner <br /> Barghausen Consulting Engineers, Inc. <br /> IH2I�71nc x e e4o, <br /> kens.tvii`Pi C.,,, <br /> ba rm strong0 barghaugm.com <br /> Phone: (425) 656-7466 <br /> Cell: (206)799-054£2 <br /> 1 <br />