z�
<br /> co
<br /> TRACY, CA ADDITIVE TANK ADDITION
<br /> UNDERGROUND TANK INSTALLATION DETAILS 0
<br /> z 00
<br /> 0 U')
<br /> c � z <
<br /> 0
<br /> _j cc
<br /> Z , Lo
<br /> c'
<br /> cc
<br /> 7" CONCRETE TANK SLAB
<br /> MATCH EX. CROWN WI C 18" O.C. f30TP I WAYS
<br /> — k`_XISTING CONCRETE: PAVEMENT TO REMAIN °
<br /> (TYP, ALL} -�TF.� . _ P(TYP.} CC 0
<br /> 1 DOMED CONCRETE FINISH
<br /> 111� Tril cl Thr 1� �
<br /> cc
<br /> r,
<br /> uz- U _. = _w __ _. _._ __ GUARD POST. G"0 STD, PIPE _... cq
<br /> °` CONCRETE FILLED & PAINTEDTO
<br /> 0
<br /> , \
<br /> I
<br /> MATCH EXISTING IMPROVEMENTS,
<br /> , v
<br /> APPLY REFLECTIVE 'PAPE AS c�
<br /> LA
<br /> APPROPRIATE FOR SAF FTY/VISIBILITY.
<br /> MIN.
<br /> - SAWCI.)T AND MATCH WITH .®
<br /> --
<br /> #3 TCI' & LEOTTOM �
<br /> EXITING PER ~JOINT AT TANK NOTE: EX. GUARD POSTS ONSITE
<br /> ABOUND ALL PENETRATIONS (1YP.) SLAB DETAIL. BELOW. LOCATION HAVE BEEN PAINTED. COLOR
<br /> PER PLANS HEET C3 VARIES TO MATCH
<br /> EXISTING IMPROVEMENTS
<br /> GRADE
<br /> - PEA GRAVEL
<br /> NOTE.
<br /> -FILL_ W1 JOINT SEALER r ALL MANHOLES ON THE TANK SLAB SHALL BE INSTALLED WITH A CROWN OFNEW CONCRETE �
<br /> CONCRETE THAT MATCHES EXISTING TO PREVENT WATER INTRUSION INTO THE
<br /> PAVEMENT �� ,� " EXISTING CONCRETE PAVEMENT • 3"-D'
<br /> MANHOLE, THE OWNER'S ENGINEER WILL BE REQUIRED TO SIGN OFF ON THIS ITEM \
<br /> ON THE TANK INSTALLATION CHECKLIST BEFORE CONTRACTOR WILL BE PAID. - EMBED
<br /> CONTRACTOR WILL BE REQUIRED TO REINSTALL ENTIRE DRIVE SLAB AT OWN15 _......_
<br /> -
<br /> EXPENSE IF THIS DESIGN REQUIREMENT IS NOT MET. � � r zcq
<br /> R
<br /> CONCRETE SLAB SPECIFICOONS
<br /> a
<br /> N
<br /> 2�- ti ��T, x1 J" SI100f1I D0INELS CONCRETE FOOTING ro CC
<br /> 1. UNLESS OTHERWISE NOTED ON THESE DRAWINGS. 0 15" O.C. CE.NTEREIE
<br /> cr. CONCRETE - REGULAR WEIGHT HARD ROCK CONCRETE (150 LBS/CU FT)
<br /> IN JOINT (OILED)
<br /> ba CEMENT TYPE 11, SULFATE RESISTANT
<br /> c; AGGREGATES ASTM C33, (MAXIMUM SIZE 3/4 INCITES)
<br /> 3G 00 PS10NC1RETSL B R(DE GNi BASED ON 2,000 PSI NO SPECIAL INSPECTION REQUIRED} JOINT AT TANK SLAB _j <
<br /> e. SLUMP _ 3"+ 1" - 4" MAXIMUM AT POINT OF PLACEMENT TYPICAL
<br /> f, SHRINKAGE _ 0,05% MAXIMUM NOT Ta SCALE 3 —e� .,.,.,.................. .,..........�
<br /> 9, ENTRAINED AIR RANGE - 4% TO 7% NST TO SCALE
<br /> 2. CONCRETE SHALL BE NORMAL WEIGHT WITH A MIX OF 1 : 2 1/2 : 3 1/2„ WITH A MAXIMUM
<br /> 7 1/2 GALLONS OF WATER PER SACK.
<br /> 1 REINFORCING STEEL FOR TANK SLABS SHALL BE #4 REBAR @ 18" O.C, BOTH WAYS
<br /> SUMP CAGES SHALL BE #4 REBAR TOP AND BOTTOM (4 BARS).
<br /> 4, MAINTAIN CONCRETE IN A MOIST CONDITION FOR AT LEAST '7 DAYS AFTER PLACEMENT.
<br /> 5. PLACE CONCRETE DIRECTLY FROM TRUCK INTO FORMS, DO NOT PUMP CONCRETE-UNLESS
<br /> SPECIAL INSPECTION, IN ACCORDANCE WITH CHAPTER 3 OF THE UBC, IS PROVIDED,
<br /> 6, CONSOLIDATE CONCRETE IN PLACE USING A MECHANICAL VIBRATOR.
<br /> 7, BEFORE PLACING CONCRETE, SECURE REINFORCING STEEL, ANCHOR BOLTS, DOWELS, AND
<br /> OTHER INSERTS IN POSITION TO PREVENT MOVEMENT.
<br /> B. MATERIALS AND WORKMANSHIP SHALL CONFORM TO A.C.I. -- 318 (SPECIFICATIONS OF THE
<br /> DESIGN AND PLACEMENT OF CONCRETE). c` MAL P. GRl1BB \
<br /> 7B
<br /> 67`30ASPHALT PAVEMENT PATCH AS PER DETAIL 2 MATCH
<br /> /
<br /> EXIST NG MATERIALS AND THICKNESS WHICHEVERR IS GREATER. A�:\ V 1 �
<br /> LANDSCAPE AREA - MULCH AND TOPSOILS AS PER L1; MIN,
<br /> NEAT LINE SAWCUT PRIOR__.._.. ,_.__" 301 MULCH OVER 4" TOPSOIL
<br /> TO PAVEMENT PATCH WITH
<br /> �"
<br /> HOT TAR SEAL LANDSCAPE AREA BACKFILL W _"COMPETENT NATIVE MATERIAL 5 0
<br /> Imo. \ __
<br /> REPLACE IN LIKE KIND, COMPACT TO 90% RELATIVE DENSITY. U) c
<br /> FI US CRUSHED TOP
<br /> 01 . .�_ . _. .. ....... _.., , AR BACKFILL L ITH B MI
<br /> TRAFFIC EAS B C L W 5/ N
<br /> NC)1 1a 7(�ALF� � .
<br /> _ \\\ COARSE AND COMPACT TO 95% MAX. RELATIVE DENSITY.
<br /> Y � �
<br /> r h.
<br /> r -r
<br /> POWER AND.___ \ N..._OTI `
<br /> CONTROL CONDUITSm
<br /> PER PLAN C3V� \\, 1. PROVIDE PULL BOXES (SILE PER CODE) FOR CONDUITS AS REQUIRED FOR � �, � �)
<br /> EVERY 250` OR AFTER A TOTAL OF' 270 DEGREES OF BENDS, _y >
<br /> 2. PROVIDE SUFFICIENT ADDITIONAL LENGTH OF CONDUCTORS Qa
<br /> 4" CER. \/ AT THE TERMINATION POINTS OF ALL CONDUITS FOR FINAL
<br /> EQUIPMENT HOOKUP, v
<br /> o 0 ,0, ca c..)
<br /> 3. SUPPLY AND INSTALL ALL CONDUITS/CONDUCTORS AND rl
<br /> A 25 LB, PULL WIRE IN EACH SPARE/FUTURE CONDUIT, 0 Z uj
<br /> 4 i
<br /> U)
<br /> 24" MAX x a
<br /> z n_.
<br /> Ld
<br /> �- 3" ASPHALT CONCRETE PAVEMENT "SCHOOL 12" MIN 0
<br /> r 0 00
<br /> YARD MIX"
<br /> c (D 00 Z
<br /> Ld
<br /> Ln
<br /> . ., Ln
<br /> `x = - B BASE COURSE COMPACTED 95% CONDUIT
<br /> CEJ C14
<br /> (2" MINERAL AGGREGATE TYPE 1) � _.�. _ .. _ ,_ , _ ... ......�...... CN \ u(N CN4
<br /> (Caw MINERAL AGGREGATE TYPE 2) (�_)__N_O_T__-_TO SC;.AI_F,
<br /> i
<br /> cs
<br /> C:7
<br /> \.-COMPACTED SUBGRADE
<br /> C1
<br /> C
<br /> 0 ASPHALT PAVEMENT
<br /> -
<br /> Q
<br /> SECTION
<br /> NaT TO SCALE cap
<br /> CD
<br /> C�
<br /> E LO
<br /> �
<br /> �>
<br /> 0.a U C
<br /> ca V) s"
<br /> 0 Cl.
<br /> c
<br />
|