Laserfiche WebLink
BMI 0-_99 <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES NOF-1 <br /> 2. Submit copies of ICG Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan"is available on the jobsite as required by Title 8 <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Installation of a 1,500-gallon automated underground fuel additive storage tank system, which includes minor <br /> excavation for the tank,piping to the existing UST fill sumps, converting existing singe wall fill sumps to double <br /> wall,and an electrical trench to access spare conduits. For additional information, please refer to the attached <br /> Scope of Work. <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> Please refer to the attached T-5 Materials List and Manufacturer's Cut Sheets <br /> 3 <br />