My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
INSTALL_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 1:02:11 PM
Creation date
11/8/2018 10:22:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2013
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HAMMER\1630\PR0518624\INSTALL PLAN 2013.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIBERGLASS ( UBLE-WALL SUMP INSTALLATI -4 INSTRUCTIONS <br /> . . <br /> Important: Isolate All Sumps From Direct Traffic t <br /> Loading. <br /> FIGURE H-1 Fuel vapors may be present in the tank sump.To <br /> prevent fire or explosion hazard, keep all ignition <br /> sources away when removing sump enclosure lid.Treat <br /> Reinforced Manhole Lid sump Lid Maintain Adequate any entry into sump area as confined space entry. <br /> concrete Clearance <br /> • 6.4 <br /> ........................ . • w <br /> r <br /> 3 min. � <br /> Rigid Board - p D o+R ASPHYXIATION FIRE EXPLOSION <br /> (5'X 5'X3/4' <br /> > • The gasket lubricant will require periodic replacement <br /> a as it will degrade over time.Any lubricant that will <br /> not dissolve in gasoline or water, nor attack Buna-N <br /> rubber is acceptable. While not as long lasting, other <br /> lubricants like barium grease, or petroleum jelly can <br /> also be used. Lubricant can be applied directly to the <br /> b gasket or to the inside surface of the lid flange. <br /> • The gasket is a maintenance item which will have <br /> $ to be replaced periodically or when it shows a leak <br /> during a tightness test. <br /> • The sump must be continuously monitored with an <br /> After backfilling to top of sump electronic leak detector for potential spills or leaks. <br /> • Backfill around sump to a level 3" above the <br /> horizontal position of the enclosed top. Place a 5'x J. RESERVOIRMONITORING <br /> 5'x 3/4" rigid board with hole on backfill to support • If the reservoir sensor indicates an alarm condition, <br /> concrete and provide a channel for water runoff it is necessary to first determine that the reservoir <br /> (see figure H-1). is level and that the alarm is not the result of an <br /> • Use a manhole large enough to allow sump lid incorrect initial fluid level setting. <br /> removal after installation. - Remove the sensor. <br /> • Adequate clearances must be maintained between - Test the sensor for proper operation. <br /> the sump lid and manhole lid to prevent the direct - Reset the fluid level in the reservoir by adding or <br /> transfer of traffic load to the sump. <br /> removing fluid. The proper monitoring fluid level in <br /> • Pour slab directly onto rigid board. the reservoir is 11/'from the inside bottom of the <br /> • If the sump is located in a traffic area,the concrete reservoir. <br /> traffic pad, reinforcement, and thickness must be - Reinstall the sensor and check for level. Ensure <br /> designed for job conditions and traffic loads to assure sensor is level and sitting on reservoir bottom. <br /> concrete traffic pad integrity. It is the responsibility <br /> of the tank owner or tank owner's representative to <br /> design the traffic pad for all loads. K. SUMP INSTALLATION <br /> • The Installation Checklist in this manual must <br /> be properly completed, signed by the installing <br /> contractor's representative and the tank owner's <br /> representative. <br /> • Seepage 10. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.