My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
INSTALL_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 1:02:11 PM
Creation date
11/8/2018 10:22:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2013
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HAMMER\1630\PR0518624\INSTALL PLAN 2013.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> p4 '" <br /> Environmental Health Department DIRECTOR <br /> �O. •...CODonna Heran,REHS <br /> a ? 1868 East Hazelton Avenue <br /> y: -. � :< Stockton, California 95205-6232 PROGRAM COORDINATORS <br /> Robert McClellon,REHS <br /> - - Jeff Carruesco,REHS,RDI <br /> KaseyWebsite:www.sjgovor /ehd <br /> . gLinda Foley,RENS <br /> Wbit <br /> cq�IFOR�.i`P Linda Turkatte,REHS <br /> Phone: (209)468.3420 <br /> March 1, 2013 Fax: (209)464-0138 <br /> Alexia Inigues <br /> Barghausen Consulting Engineers, Inc. <br /> 1821572 no Avenue South <br /> Kent, Washington 95136 <br /> SUBJECT: Costco Gasoline#38, 1616 E Hammer Lane, Stockton, CA 95210 SR0066146 <br /> The San Joaquin County Environmental Health Department (EHD) has completed the review of <br /> the permit application for installing of a 1,500 gallon Fuel Additive underground storage tank, <br /> and product piping from new UST to the existing gasoline UST's fill sumps on the underground <br /> storage tank (UST) system at the above noted address. The permit has been approved with the <br /> following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Garrett Backus at (209) 468-2986 to arrange the following inspection <br /> appointments (a 48-hour notice is required for inspection appointments). Please be <br /> aware that inspections for emergency work must be scheduled within five days of permit <br /> approval. <br /> a. Sensor functionality: Functionality of the monitoring system must be verified to <br /> ensure that monitoring has been restored to meet the requirements of Title 23 <br /> California Code of Regulations and the Health & Safety Code. <br /> b. Primary piping soap test: One hour pneumatic pressure test at 110% of operating <br /> pressure, or 40 psi, whichever is greater. <br /> c. Secondary piping soap test: One hour pressure test per manufacturer's guidelines. If <br /> there are no manufacturer's guidelines, test shall be performed using an applicable <br /> method specified in an industry code or engineering standard. <br /> d. Single-walled to double-walled retrofitted fill sumps annular space—verify no <br /> interstitial fluid leaks. <br /> e. Single-walled to double-walled retrofitted fill sumps -verify annular space <br /> communication from top to bottom. <br /> f. Spill bucket test: Verify minimum 5-gallon capacity and pass a one hour hydrostatic <br /> test (or equivalent). Proper drainage must also be verified. <br /> Please be aware that the facility cannot operate the Lubrizol Product UST prior to <br /> the EHD inspection and approval. <br />
The URL can be used to link to this page
Your browser does not support the video tag.