Laserfiche WebLink
&14A(l CIVIL ENGINEERING,LAND PLANNING,SURVEVING <br /> 0 i November 21, 2012 <br /> ya FEDERAL EXPRESS RECEIVE® <br /> o�rNG erv�Ng�� (209)468-2986 <br /> NOV 26 2012 <br /> Garrett Backus, REHS <br /> Senior Registered Environmental Health Specialist ENVIRONMENTAL HEALTH <br /> San Joaquin County Environmental Health Department PERMIT/SERVICES <br /> 1868 East Hazelton Avenue <br /> Stockton, CA 95205 <br /> RE: Response to Comments—UST Install Application and Retrofit Repair <br /> Costco Gasoline—Automated Fuel Additive Tank Installation <br /> 1616 East Hammer Lane, Stockton, California 95210 <br /> Costco Loc. No. 38/Our Job No. 10199 <br /> Dear Garrett: <br /> We have revised the documents for the above-referenced project in accordance with your e-mail comments <br /> dated November 19, 2012. Enclosed are the following documents for your review and approval: <br /> 1. One (1) copy of your November 19, 2012 email comments <br /> 2. One (1) copy each of the revised and signed Operating Permit Application — Tank Information for <br /> Tanks 1-3, signed November 20, 2012 <br /> The following outline provides each of your comments in italics exactly as written, along with a narrative <br /> response describing how each comment was addressed: <br /> 1) In the vent piping transition sump section, instead of 'none" check off "single wall". A vent sump <br /> was added to this site in 2011. <br /> Response: The forms have been revised to indicate"single wall." <br /> 2) In the riser secondary containment section, instead of none" please check "fiberglass" for the <br /> fiberglass tank top sump around the steel riser pipe. <br /> Response: The riser secondary containment construction type has been changed to <br /> "fiberglass." <br /> We believe that the above responses, together with the enclosed revised documents, address all of the <br /> comments in your November 19, 2012 email. Please review and approve the enclosed at your earliest <br /> convenience. If you have questions or need additional information, please do not hesitate to contact me at this <br /> office. Thank you. <br /> Respectfully, <br /> M. Alexia Inigues <br /> Project Planner <br /> MAI/BLA/jb <br /> 10199c.094.doc <br /> enc: As Noted <br /> cc: David H Rogers, Costco Wholesale <br /> Jay S. Grubb, Barghausen Consulting Engineers, Inc. <br /> Daniel B. Goalwin, Barghausen Consulting Engineers, Inc. <br /> John Ellingsen, Barghausen Consulting Engineers, Inc. <br /> Chris M. Tebaldi, Barghausen Consulting Engineers, Inc. <br /> Briana L.Armstrong, Barghausen Consulting Engineers, Inc. <br /> 18215 72ND AVENUE SOUTH KENT,WA 98032 (425)251-6222 (425)251-8782 FAX <br /> BRANCH OFFICES ♦ OLYMPIA,WA ♦ CONCORD,CA ♦ TEMECULA,CA <br /> www.barghausen.com <br />