Laserfiche WebLink
m�le: <br /> GHA VS�Z <br /> CIVIL ENGINEERING,LANG PLANNING,SURVEYING,ENVIRONMENTAL SERVICES <br /> ,; November 16, 2012 <br /> °z ? STANDARD FEDERAL EXPRESS <br /> S y <br /> °<T, �EP (209)466-3420 <br /> NG ENG\N <br /> Kasey Foley RECEIVE® <br /> San Joaquin County NOV 19 2012 <br /> Environmental Health Department <br /> Certified Unified Program Agency <br /> 600 East Main Street ENVIRONMENTAL HEALTH <br /> Stockton, CA 95202 PERMIT/SERVICES <br /> RE: Underground Storage Tank Install Application and Retrofit Repair <br /> Costco Gasoline - Fuel Additive Program <br /> 1616 East Hammer Lane, Stockton, California 95210 <br /> Costco Loc. No. 38/Our Job No. 10199 <br /> Dear Kasey: <br /> On behalf of our client, Costco Wholesale, Barghausen Consulting Engineers, Inc. is submitting two <br /> (2)applications; one (1) for the Installation of the Fuel Additive tank and equipment and one (1) for the <br /> retrofitting of the existing gasoline storage tanks to accommodate the Fuel Additive Tank. <br /> The project includes the installation of a 1,500-gallon automated underground fuel additive storage tank <br /> system, which includes minor excavation for the piping, access to the existing underground storage tank <br /> sumps, and access to spare conduits. For work associated with the installation, the estimated project <br /> valuation is $135,000. <br /> The fuel additive stored in the underground storage tank, LUBRIZOL®9888, is a Class I flammable liquid <br /> and will be mixed with the gasoline in the existing underground storage tanks. The U.S. Environmental <br /> Protection Agency (EPA) requires use of deposit control additives, such as LUBRIZOLO 9888, in all <br /> gasoline to keep engines clean for reduced emissions. LUBRIZOL®9888 meets all EPA requirements for <br /> deposit control additives. <br /> Costco Wholesale has tentatively selected Jones Covey Group, Inc. as the General Contractor for the <br /> overall program. A final contractor selection process for this specific site cannot be initiated until we <br /> receive direction from your office as to the plan comments and/or corrections. Therefore, Costco <br /> Wholesale would like to proceed with the submittals without the final bid award until we have received <br /> comments and have the installation plans detailed according to your specifications. <br /> Enclosed are the following items for review and approval: <br /> 1. One(1) Costco Wholesale Authorization Letter, dated December 16, 2011 <br /> 2. One (1) copy of the California State Water Resources Control Board letter, dated <br /> February 2, 2012 <br /> 3. Six(6)copies of the Scope of Work—Option 1 <br /> 4. Six(6) sets of the Manufacturers' Affirmative Statement of Compatibility <br /> 5. Six (6) sets of Manufacturers' Equipment Cut Sheets—Option 1 <br /> 18215 72ND AVENUE SOUTH KENT,WA 98032 (425)251-6222 (425)251-8782 FAX <br /> BRANCH OFFICES ♦ OLYMPIA,WA ♦ TEMECULA,CA ♦ WALNUT CREEK,CA <br /> www.barghausen.com <br />