My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
244
>
2300 - Underground Storage Tank Program
>
PR0231137
>
INSTALL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:41:29 AM
Creation date
11/8/2018 10:22:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1998
RECORD_ID
PR0231137
PE
2361
FACILITY_ID
FA0001554
FACILITY_NAME
MIRACLE MILE MARKET
STREET_NUMBER
244
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13708014
CURRENT_STATUS
01
SITE_LOCATION
244 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HARDING\244\PR0231137\1998 INSTALL .PDF
QuestysFileName
1998 INSTALL
QuestysRecordDate
7/21/2016 4:27:36 PM
QuestysRecordID
3149333
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ii <br /> <,For further information concerning fabric specifications and instal- SUMMARY <br /> lafiDn procedures,consult the fitter fabric supplier's installation 1. Prepare the tank bed. <br /> guides or instructions. 2. Set and level the tanks. <br /> To install filter fabric,typically filter fabric manufacturers recom- 3. Measure the tank diameter. <br /> mend that the installer line the excavation sides and bottom with 4. Install holddown hardware(it applicable). <br /> the fabric.Overlap adjoining panels by at least twelve inches. 5. Place and probe the first two lifts of backfill material. <br /> Place backfill material on the panels around the edge of the hole 6. Add backfill to the top of the tank. <br /> to anchor them in place.. 7. Measure the tank diameter and repeat the air test. <br /> In wet-hole conditions,use backfill material to sink and hold the After the air test and measurement of tank deflection are success- <br /> fabric <br /> uccess fabric in place on the hole bottom. fully completed,it is recommended that the tank be ballasted until <br /> piping installation and final backfilling to grade is completed.When <br /> DRY T filling the tank make sure that the tank is adequately vented.The <br /> CAUTION:Xerxes recommends that every site be thoroughly vent must be large enough to allow the displaced air to escape. <br /> evaluated for the potential to trap water or otherwise subject the NOTE:Do not ballast the tank until the ball is even with the top of the tank. <br /> tank to a rise in the local water table.Xerxes recommends that all WARNING:If product is used as ballast,exercise special care in <br /> tanks be anchored in installations in which water may enter the handling.Safeguard against sparks,fire or product spills.Improper ; <br /> hole.Failure to anchor the tank in a wet hole may damage the tank handling of product can cause afire or explosion,and death, - <br /> _''or surrounding property. severe personal injury or property damage. <br /> Prepare a smooth,level bed,12"thick,of approved backfill 6. WET T <br /> LE INSTALLATION <br /> material. Place the tank or tanks ortto the bed.Do not set Xerxes <br /> tanks directly onto a concrete slab or on timbers,cradles or WARNING:Do not use air pressure to test tanks that contain flam- <br /> directly onto the hole bottom. mable or combustible liquids,or vapors,and do not perform any <br /> Leveling:As the tank is being placed,set the tank pitch as shown post installation pressuretest.The fuel and air mixture may explode <br /> on the site plans.Xerxes does not require that a tank be pitched. and cause death,severe personal injury,or property damage. <br /> All pitch is determined by the tank owners specification.. If a double CAUTION:Never allow an empty tank to remain in a wet hole,or a <br /> wair tank is pitched,the monitor should be at the low end. Use the dry hole that may become wet unless anchoring and backfilling <br /> tops of the ribs to establish longitudinal level.Establish lateral level have been completed.Failure to anchor and backfill may damage <br /> by placing the level across the top of a fitting,a manway or a collar. the tank or surrounding property. <br /> When the tank is placed,take the first diameter reading(Deflection NOTE:Deflection readings to be taken in sequence similar to steps described.in'' <br /> reading"A'on the checklist).See Section 13 for instructions on sections. <br /> taking deflection readings. Pump the water from the hole to maintain minimum water level. j <br /> If the tank is to be anchored,install the anchoring hardware at this Add a minimum of 12 inches of well-placed backfill material to the <br /> time(See Section 7). hole,and level the bed to assure uniform bottom support for the { <br /> BACKFILLING tank. Position the tank in the hole. ! <br /> Use only approved backfill material(See Section 3).Do not mix Partially ballast tank until it settles firmly on the prepared bed. <br /> approved material with sand or native soil. Do not use native soil Ballast level in a tank must never exceed water level in hole during <br /> as backfill material.All excavated native soil must be replaced with installation.Use only enough ballast to sink the tank until backfill <br /> approved material.Place one 12"lift of material evenly around the material is even with the top of the tank. <br /> tank.From the hole side or the top of an adjacent tank,work the WARNING:If product is used as ballast,exercise special care in <br /> material by hand completely beneath the tank body and domes to handling.Safeguard against sparks,fire or product spills.Improper <br /> provide full support.Use a nonmetal probe bar long enough to handling of product can cause a fire or explosion,and death, <br /> reach beneath the tank and push the backfill in place.Repeat this severe personal injury or property damage. <br /> step with a second 12"lift.After the second lift of material has been After leveling tanks,the anchoring procedures in Section 7 must <br /> placed and probed,the backfill can be brought to the top of the be followed. <br /> tank without further hand work. <br /> CAUTION:Do not strike the tank with the probe bar.The tank may Backfill must be added evenly after anchoring,and remaining <br /> be damaged and require repair. dry hole backfilling procedures should be followed as stated in <br /> Section 5. <br /> _ = NOTE:Cover depth must meet minimum depth specified in Section 7 of these <br /> R 1 GH7 _ - WRONG _ installation instructions. <br /> NOTE:It is recommended that the tank be completelyballasted once backfill is even <br /> with the top of the tank. <br /> —� <br /> 14 _ jj <br /> FIGURE 5-1 FIGURE 5-2 <br /> When the tank is backfilled to the tank top: <br /> •take an intermediate diameter reading as an in-process check. MRE <br /> — <br /> •repeat the 5 PSIG(3 PSIG for 12-foot tanks)air test as <br /> outlined in Section 2,soaping all exposed areas of the tank <br /> and all fittings. FIGURE 6-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.