My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
244
>
2300 - Underground Storage Tank Program
>
PR0231137
>
INSTALL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:41:29 AM
Creation date
11/8/2018 10:22:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1998
RECORD_ID
PR0231137
PE
2361
FACILITY_ID
FA0001554
FACILITY_NAME
MIRACLE MILE MARKET
STREET_NUMBER
244
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13708014
CURRENT_STATUS
01
SITE_LOCATION
244 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HARDING\244\PR0231137\1998 INSTALL .PDF
QuestysFileName
1998 INSTALL
QuestysRecordDate
7/21/2016 4:27:36 PM
QuestysRecordID
3149333
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*40, <br /> HOLDDOWN STRAPS: <br /> Xerxes FRP straps must be used when a tank is to be anchored. 5iR"' <br /> The location of holddown straps for each tank is marked on the srwv En <br /> tank by the arrow(>()symbol.Complete data for holddown <br /> straps are given in Table 7-2 and Figure 7-2. TUIWMKLE <br /> CAUTION:Place the straps only in the locations designated by the will NK <br /> win <br /> arrow symbol(>O. CLAMPS / <br /> To evenly distribute buoyancy loads,tighten all holddown straps <br /> uniformly until they are snug over the ribs but cause no deflection <br /> of the tank.Make an intermediate measurement of the tank diame- <br /> ter AFTER the straps have been installed and tightened. -IIII = 11-MI III I 1-Mi III I--_1 11 111 <br /> HARDWARE AND ANCHORING POINTS: III -I 111111=21 =I III g-11111mo;111111 <br /> Anchoring hardware and anchor points must be sized according to FIGURE 7-4A <br /> Table 7-3 and manufactured to industry standards and dimensions. <br /> The installing contractor is responsible for providing hardware and <br /> anchor points of sufficient strength.The particular configuration 8. POSTINSTALLATION <br /> of hardware will be determined by the owner or the owner's WARNING:Do not use air pressure to test tanks that contain <br /> representative. Locate the anchor points as shown in Table 7-2 flammable or combustible liquids or vapors,and do not perform <br /> and Figure 7-2. Refer to dimension"E".Align all anchor points with any post installation pressure test.The fuel/air mixture may <br /> the marked(>()location on the tanks,within a tolerance of ± 1". explode and cause death,severe personal injury or property <br /> For specific information on hardware and its use,consult the damage.Tanks that will be ballasted with a flammable product <br /> hardware rnanufacturer. <br /> should be air tested before ballasting. <br /> CAUTION:Use only appropriate sized hardware with the strap <br /> eye.Oversized hardware may damage the strap eye and result WARNING:If product is used as ballast,exercise special care in <br /> s <br /> in personal injury or property damage.See Figure 7-4 for strap handling.Safeguard against sparks,fire or product spills. Improper <br /> eye dimensions. handling of product can cause a fire or explosion,and may result <br /> in death,severe personal injury or property damage. <br /> TABLE 7-3 INTERMEDIATE DEFLECTION MEASUREMENT <br /> N MINIMUM TURNBUCKLE DIAMETER MINIMUM After backfill is brought to the top of the tank,make an intermediate <br /> >' TANK (BYTYPE) WIRE ROPE measurement of vertical deflection according to the instructions <br /> DIAMETER IKIOK ,TAW EYE DIAMETER in Section 13. <br /> TEST <br /> 4' 3/4" 12" 12" 3/6" After the tank has been measured and vertical deflection is deter- <br /> 6' 3/4" 12" 1/2^ 3r8^ mined to be within the limits specified by Xerxes,the tank must be <br /> pressure tested to ensure that no damage occurred during installa- <br /> B 11/4 3/4 3/4" 12" tion.The procedure in Section 2 Pre-installation Testing should be <br /> 10' 11/4" 314' 3/4" 12" followed,soaping all exposed areas of the tank and all fittings. <br /> 12' 11/4" 3/4" 3/4" 12" Because most of the tank exterior is no longer visible,the tank <br /> must be tested by checking the gauge for one hour at the test <br /> manifold for any drop in pressure.Carefully relieve the pressure in <br /> the tank and if applicable remove the hose/valve assembly or quick <br /> 3-1/4" disconnect assembly from dry Double Wall tanks. <br /> 9. BALLASTING <br /> 1-3/8„ WARNING:Do not use air pressure to test tanks that contain <br /> flammable or combustible liquids or vapors and do not perform <br /> any post installation pressure test.The fuel/air mixture may <br /> explode and cause death,severe personal injury,or property <br /> damage.Tanks that will be ballasted with a flammable product <br /> FIGURE 7-4 should be air tested before ballasting. <br /> WARNING: If product is used as ballast,exercise special care in <br /> handling.Safeguard against sparks,fire or product spills.Improper <br /> handling of product can cause a fire or explosion,and may result <br /> _ NOTE:Drop-forged type turnbuckle may be used in place of all or a portion of in death,severe personal injury or property damage. <br /> JK vire rope. The tank may be ballasted after the backfill is even with the top <br />\ NOTE:All exposed metal on the holddown straps,turnbuckles and/or threaded rod of the tank and post-installation testing,if applicable,has been <br /> must be coated galvanized to prevent corrosion f three clam). successfully completed.Only under wet-hole conditions as <br /> NOTE:When ypeo fasteningwire rope,use a minimum of three clamps on each joint. described In Section 6,should ballast be added before the backfill <br /> Use shackle-type or chair-type clamps as appropriate(figure 7-4A). <br /> is even with the top of the tank.When filling the tank,make sure <br /> the tank is property vented.The vent must be large enough to <br /> allow the displaced air to escape. <br />
The URL can be used to link to this page
Your browser does not support the video tag.