My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
244
>
2300 - Underground Storage Tank Program
>
PR0231137
>
INSTALL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:41:29 AM
Creation date
11/8/2018 10:22:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1998
RECORD_ID
PR0231137
PE
2361
FACILITY_ID
FA0001554
FACILITY_NAME
MIRACLE MILE MARKET
STREET_NUMBER
244
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13708014
CURRENT_STATUS
01
SITE_LOCATION
244 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HARDING\244\PR0231137\1998 INSTALL .PDF
QuestysFileName
1998 INSTALL
QuestysRecordDate
7/21/2016 4:27:36 PM
QuestysRecordID
3149333
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OHILLSIDE INSTALLA,,,.N CAUTION: DDT STRIKE THE TANK <br /> Tanks may be installed on moderately sloping terrain WITH STEEL BAR <br /> provided the slope does not exceed 10 degrees. The After backfill is brought to top of tank,it is recommended <br /> downhill side must consist of native soil. Fill dirt is not that water or product be added as ballast until piping <br /> permitted on this side to alter the grade of the slope. and final backfilling to grade is accomplished.When fill- <br /> The top of the tank must be below the surface of the ing with ballast or product, make sure the tank is ade- <br /> downhill side, and must be covered by material with quately vented. <br /> depths as stated in item 4. CAUTION—Do not ballast tank with water or product <br /> until backfill is even with top of tank (except as noted in <br /> wet hole procedure). <br /> The same material as specified in Item 3 must be used <br /> to completely fill excavation. The backfill must be free <br /> -III 100 of debris.Any blocks or bricks used as support material <br /> during piping must be removed prior to completion of <br /> - = backfilling. Safety measures, such as placing barri- <br /> cades until installation is complete, should be used <br /> III— III III— around the excavation site. <br /> II = NOTE:If there is any reason to believe that water might enter the hole <br /> after installation,or if hole is in clay soil with poor drainage,anchoring <br /> II II is required. <br /> II II III III III — I 1 - I IIII I — O WET HOLE INSTALLATION <br /> Pump the water from the hole to maintain minimum wa- <br /> ter level.Add a minimum of 12 inches(30 cm)of backfill <br /> O7 material to the hole, and level the bed to assure com- <br /> DRY HOLE INSTALLATION plete bottom support for the tank. Position the tank in <br /> The bed must be smooth and level, and must contain a the hole.The 24 inch(60 cm)spacing between tank and <br /> minimum of 12 inches (30cm) of smooth and level pea side wall must be maintained as a minimum in a wet <br /> gravel or stone crushings. (See (5 ) Place the tank or hole installation. <br /> tanks on the bed carefully. Do not install Xerxes Partially fill the tank with water until it settles firmly on <br /> Century-Cast Tanks directly on a concrete slab,or grout the prepared bed. Ballast level in a tank must never <br /> tanks in wet concrete. Also, do not install these tanks exceed water level in hole during installation. Use only <br /> on timbers,beams,cradles or directly on the hole bottom. enough water to ballast the tank until backfill material is <br /> j Leveling even with the top of the tank. <br /> After leveling tanks, <br /> After the tank is bedded, and prior to backfilling, it must the anchoring proce- <br /> be leveled. For longitudinal leveling,place the level across dures in Item 9 must <br /> the tank ribs at the top surface. Lateral leveling is ac- be followed. <br /> complished by placing the level across the top of the Backfill must be added <br /> tank outlet or manway. evenly after anchor- <br /> Backfilling ing, and remaining dry <br /> hole backfilling pro- <br /> Backfill uniformly with the same material used for bed- cedures should be _- <br /> ding. In freezing conditions make sure the material is followed as stated in - - - <br /> dry and free of ice and snow. First,place a 12 inch(30cm) Item 7. 12" <br /> lift of backfill evenly around the tank. Work the material <br /> completely beneath the tank body and endcaps by hand <br /> in order to provide full support. A board or tamping bar <br /> should be used to NOTE:Cover depth must meet minimum depth specified in Item 4 of <br /> force the material in I I- ' these installation instructions. <br /> place.After the first WRONGr t NOTE:It is recommended the tank be ballasted with water or product <br /> 18-24 Inches (45- r ,a once backfill is even with the top of the tank. <br /> 60cm) of backfill is ff <br /> in place, use the <br /> tamping bar to work -W111ML,the backfill into the <br /> voids under the <br /> edges of the tank RIGHT <br /> and ribs and around <br /> '\ the endcaps. Re- <br /> mainder of backfill " <br /> can now be done <br /> without further hand - <br /> work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.