My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
244
>
2300 - Underground Storage Tank Program
>
PR0231137
>
INSTALL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:41:29 AM
Creation date
11/8/2018 10:22:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1998
RECORD_ID
PR0231137
PE
2361
FACILITY_ID
FA0001554
FACILITY_NAME
MIRACLE MILE MARKET
STREET_NUMBER
244
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13708014
CURRENT_STATUS
01
SITE_LOCATION
244 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HARDING\244\PR0231137\1998 INSTALL .PDF
QuestysFileName
1998 INSTALL
QuestysRecordDate
7/21/2016 4:27:36 PM
QuestysRecordID
3149333
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U3:2b t 1 rHN KUBBtrr a 120y41,48.s4y nu.7rn rmc'rrv» <br /> OPW 61 SO OVERFILL PREVENTION VALVES <br /> 61SO Two Point 61SOC Coaxial 61SOP Poppeted Coaxial <br /> The OPW 61 SO is available in two The OPW 61SOC is available for The OPW 61 SOP is available for <br /> styles for two point fill,separate prod- coaxial fill,single productivapor con- poppeted coaxial fill applications and is <br /> uct and vapor connection applications. nection applications.This member of CARB certified for gasoline vapor <br /> The OPW 6150 replaces the standard the renes replaces the standard coaxial recovery systems.Executive order <br /> fill rube in the 4"tank riser pipe.In fill drop rube in the 4"tank nser pipe. G-70-52AN- <br /> addition,the 61SOM is available and <br /> designed for compatibility with M-85 <br /> and M-100 methanol fuels.Both the <br /> OPW 61SO and 61SOM are available <br /> with scaled vapor paths for use in <br /> CARB certified areas.The OPW 6150- <br /> 1000 and 61SO-I000(CARB)feature a <br /> groove that runs the full length of the <br /> tube to allow a gauging system to be <br /> used in conjunction with the overfill <br /> prevention system <br /> Aduanng now <br /> 61SOR Remote 61SO-3" Two Point 61SO-4BYT <br /> The OPW 61 SOR is designed for two Designed for use with two point fill The OPW 61SO-4BYT provides the <br /> point remote fill applications,where the applications,the OPW 61SO-3000 same operation as all other 61 SO over- <br /> fill point is not directly over the UST. replaces the drop tube in 3'tank riser Frll prevention valves but features the <br /> The 61SOR enables sticking of the pipesvalve only.Shipped without drop tubes, <br /> tank the 6150-4BYT is designed to adapt to <br /> existing coaxial and conventional drop <br /> tubes that meet specific OPW Sim- <br /> dards. <br /> s <br />
The URL can be used to link to this page
Your browser does not support the video tag.