Laserfiche WebLink
%W ... <br /> BRAVO B-200® PRESSURIZED SECONDARY <br /> PIPING SYSTEM INSTALLATION <br /> Secondary containment piping <br /> on be terminated by 3"hose(Dia- <br /> gram 6-A)or by 3"rigid piping(Diagram <br /> 6-B). <br /> •The Bravo B-18.3 telescopic fitting <br /> (standard)has a 3"adapter for a <br /> 3"hose. <br /> •Bravo's B-18-4 telescopic fitting <br /> can be used with a 3"rigid female <br /> NPT or a 4" hose (exterior <br /> Vapor Line product Line dimension).� ) (Diagram 6•A and CrB). <br /> ZFor flexible hose installation, <br /> .clamp off hoses at the end of <br /> Diagram 6-A the B-18 fitting. For rigid pipe <br /> installation, tighten pipe to the fit- <br /> ting and seal with pipe dope. <br /> PLEASE NoTE: A Bravo B-1000 Series <br /> Submersible Pump Containment <br /> Box is recommended to complete <br /> the system. <br /> Vapor line • I� e e I �I <br /> Diagram 6-13 <br /> ocn emm vav,...u, <br /> TYPICAL <br /> SINGLE <br /> BOX PLAN <br /> g I <br /> ` Diagram 6-C <br />