My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
244
>
2300 - Underground Storage Tank Program
>
PR0231137
>
INSTALL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:41:29 AM
Creation date
11/8/2018 10:22:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1998
RECORD_ID
PR0231137
PE
2361
FACILITY_ID
FA0001554
FACILITY_NAME
MIRACLE MILE MARKET
STREET_NUMBER
244
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13708014
CURRENT_STATUS
01
SITE_LOCATION
244 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HARDING\244\PR0231137\1998 INSTALL .PDF
QuestysFileName
1998 INSTALL
QuestysRecordDate
7/21/2016 4:27:36 PM
QuestysRecordID
3149333
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Discharge Head of the FE <br /> Petro Submerged rurbine Pump <br /> features state-of-the-art engi- <br /> neering.It has been designed to <br /> provide the ultimate in ease of <br /> service and installation. <br /> Easy And Efficient <br /> This unit features a three com- <br /> ponent system for easy service <br /> 1 or replacement.The line check <br /> ! valve,extractable head and <br /> the junction box can each be <br /> serviced individually from the <br /> top without disturbing the s ;, <br /> i <br /> remaining two parts. <br /> Unique Features <br /> When manifold tank instal- This valve,which is indepen- wires.A conduit water seal at <br /> lations are a factor,a syphon dent of the removable head,is the outlet of the junction box is <br /> check valve is furnished to accessible by simply removing provided for the incoming <br /> assist in automatically main- two easy-to-reach bolts. power wires. <br /> Otaining equalized product levels By turning the valve clamp No electrician is needed to <br /> in the tanks. screw over the relief valve,air break a connection when the <br /> Each unit also features a for pressure testing the system pump and motor unit need to be <br /> built-in line pressure monitor can be introduced at any time removed.If at any time you need <br /> jport which eliminates the need through an air test opening. to remove the pump,all that is <br /> for an auxiliary adapter housing. Air and vapor are removed required to break the circuit is <br /> i The line check valve,with from the product through a to simply turn the jack screw. <br /> built-in relief valve,protects passage in the discharge head This <br /> the dispenser and piping from and returned to the tank—below separates <br /> abnormal pressures. the product level—through a the <br /> steel vapor tube.This insures plug-in <br /> solid,air-free product delivery connec- <br /> to the island dispensers. tion in an, <br /> The combination starting and explosion- <br /> running capacitor is completely proof <br /> contained in the discharge enclosure. <br /> manifold assembly,yet Just lift <br /> remains separate from up and swing the wiring yoke <br /> { the check valve and out of the way to automatically <br /> extractable head. disconnect the power to the <br /> This completely sepa- pumping unit. <br /> rates the capacitor <br /> housing from the fluid <br /> passage.A simple two <br /> wire circuit eliminates <br /> \ color coding and any <br /> worry about crossing <br /> 1 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.