My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
244
>
2300 - Underground Storage Tank Program
>
PR0231137
>
INSTALL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:41:29 AM
Creation date
11/8/2018 10:22:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1998
RECORD_ID
PR0231137
PE
2361
FACILITY_ID
FA0001554
FACILITY_NAME
MIRACLE MILE MARKET
STREET_NUMBER
244
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13708014
CURRENT_STATUS
01
SITE_LOCATION
244 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HARDING\244\PR0231137\1998 INSTALL .PDF
QuestysFileName
1998 INSTALL
QuestysRecordDate
7/21/2016 4:27:36 PM
QuestysRecordID
3149333
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UFT SYSTEM DRAWING INFORMATION <br /> 1. ✓ Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br /> 2• Plans drawn to scale in non-erasable print. <br /> 3. ✓ Plot plan to show location of tanks and all associated piping. <br /> I, <br /> 4. Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. Tank cross-sectional diagram. <br /> 6. ✓ Detail of tank, associated piping, excavation and cover. <br /> a 7. Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16, <br /> Article 3, Section 2631 (b) 8 26357 <br /> B• V/ Verification of product compatibility with the tank(s), piping, monitoring <br /> / tlevice(s), epoxy or silicone glues, etc. <br /> 9. v—/ Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br /> 10. ✓ At the installation site, prior to installation, a tightness test shall be performed on both primary (10) and <br /> secondary (2°) containment systems before covering. [Section 2635 (a) (3) $ (A)] <br /> 11. Tank integrity test required upon completion of installation with tank in operatincondition. Test results to be <br /> Chapter 6.7, Section 25291 (h)] <br /> submitted directly to PHS-END from the testing company or owner of facilityg. [Health 8 Safety Code, Division 20, <br /> 12. TANK COMPOSITION <br /> TANK # # <br /> CAPACITY D 000 0c) <br /> MANUFACTURER �� X <br /> COMPOSITION g <br /> MODEL {< <br /> PRODUCT <br /> CORROSION PROTECTION <br /> U.L. LISTED <br /> COMPATIBILITY WITH 1007. <br /> METHANOL S <br /> 13. TANK(s) TO BE INSTALLED <br /> A. Steel-clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> / (2) Vacuum applied to interstitial space. <br /> B. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular (primary tank pressure test). <br /> C. Non-clad steel tank [Section 2635 (a) (2) (A)] <br /> (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br /> etc.). <br /> (2) Field installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist. <br /> (3) Impressed current systems to be inspected no less than every 60 days. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.