My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
244
>
2300 - Underground Storage Tank Program
>
PR0231137
>
INSTALL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:41:29 AM
Creation date
11/8/2018 10:22:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1998
RECORD_ID
PR0231137
PE
2361
FACILITY_ID
FA0001554
FACILITY_NAME
MIRACLE MILE MARKET
STREET_NUMBER
244
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13708014
CURRENT_STATUS
01
SITE_LOCATION
244 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HARDING\244\PR0231137\1998 INSTALL .PDF
QuestysFileName
1998 INSTALL
QuestysRecordDate
7/21/2016 4:27:36 PM
QuestysRecordID
3149333
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19. - Piping (Cross-secti diagram, including connections to tank arAwo/fspensers). <br /> (A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br /> _ Restricts delivery of flow to tank [Section 2635 (b) (2) (B) or (C)], or <br /> ZProvide positive shut off of flow to the tank at no more than 95 % [Section 2635 (b)(2)(C)I, or <br /> (B) Vapor recovery piping designed so it cannot contain liquid phase product, or ., <br /> (C) Suction piping (below grade Piping operates at less than atmospheric pressure) [Section 2636 (a) (3)] <br /> Sloped so contents of the pipe will drain back into the storage tank if the suction is <br /> released. <br /> No valves or pumps installed below grade. <br /> Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br /> (D) _ff Corrodible underground piping protected against corrosion (Section 2636 (b)). <br /> (E) -Z Underground primary piping will meet all of the following requirements <br /> yC Primary piping in contact with hazardous substance under normal oqeration conditions shall be: <br /> installed inside a secondary containment system in the form of: <br /> secondary pipe Vault or <br /> _lined trench to be sloped to a collection sump at the low point of the piping. <br /> Primary piping and secondary containment systems will be installed in accordance with industry <br /> code of practice and voluntary consensus standards.. <br /> Lined trench used as secondary containment <br /> Material compatible with the substance stored. <br /> Covered and capable of supporting any expected vehicular traffic. <br /> (F) Underground piping with secondary containment will be equipped and monitored as follows: <br /> secondary containment will be equipped with a continuous monitoring system connected to an audible <br /> and visual alarm system. <br /> Automatic line <br /> Leak dp�ectors wn it be installed on prga rized piping <br /> Manufacturer:----x�}-�ftQ Model• S'T��[w Lp <br /> Annual monitoring will be conducted on the pressurized piping with secondary containment. <br /> Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected and when the continuous monitoring system <br /> fails or is disconnected. <br /> 20. State Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br /> 21. Plan review and operating permit fees paid. / <br /> 22. What is the approximate depth to ground water: <br /> (include source of information - borehole logs, monitor nig well data, eater <br /> studies, etc.) <br /> 23. L/ Total ntniber of tanks on site after installation: Z <br /> 24. ` County/City Fire District and Building Department notified. <br /> 25. t/ In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> responsibility [in accordance with (CCR) T'tle 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> Requirements] as an owner or operator-to submit a workplan to PHS-END Site Mitigation Unit prior to initiating any <br /> assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br /> The ou r, r..—o at or ,.it acknowledge this responsibility for workplan submittal by signature and date below. <br /> Name 64 Title �WN�� Date <br /> CONDITIONS OF APPROVAL: C 14— <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.