My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
244
>
2300 - Underground Storage Tank Program
>
PR0231137
>
INSTALL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:41:29 AM
Creation date
11/8/2018 10:22:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1998
RECORD_ID
PR0231137
PE
2361
FACILITY_ID
FA0001554
FACILITY_NAME
MIRACLE MILE MARKET
STREET_NUMBER
244
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13708014
CURRENT_STATUS
01
SITE_LOCATION
244 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HARDING\244\PR0231137\1998 INSTALL .PDF
QuestysFileName
1998 INSTALL
QuestysRecordDate
7/21/2016 4:27:36 PM
QuestysRecordID
3149333
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br /> WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit. The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> Required by Sections 2632(d) and 2641(h) CCR- <br /> Facility <br /> CRFacility Name �:" ' EA q 6 Pa's <br /> Facility Address 7,44 \6/i sr t�fs �Vtc+r7 �ct'��x°�'�,<4- <br /> A. Describe the frequency of performing the monitoring: <br /> TakLk Wjjj, (�� °a tTcO ca{7tnlcsw©tnnwl�-� c, lar Unna c <br /> Piping \ ut A"o <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> Tanker o tJ J € a - �C <br /> SC. <br /> Piping d e Lt, Q GScz <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> D. List the name(s) and title(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment: <br /> QL-' 1-61um <br /> E. Repgrung format for onitor. g: <br /> TankN\oai mr t , Z hnl+7 A264&rs ft30 "fes <br /> Piping�A/trt. [KC, Ci-F� .47- <br /> F. <br /> FTF. Descnbe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less than every 12 monthsx--R bx V-- e fJ"AmoJ"I TNr,J E&,EZe4)�TZ6 <br /> G. Describe the training necessary for the operation of UST system, including piping, <br /> and the monitoring equipment;Sro� �j <br /> r,titj_- ruea� P— ;BcarJ AtL Es5,4,eN /LJ�I��t� <br /> Arm <br />
The URL can be used to link to this page
Your browser does not support the video tag.