Laserfiche WebLink
• �ORDR—TEST 124J 840112 P. 06 <br /> F. InJank Gauging/SIR Equipment: ❑X Check this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if ih-tank gauging equipment is used to perform leak detei=tion monitoring. <br /> conitilitte the follo Ing checklist: <br /> � es U lasaut wiring been inspected for proper entry and termination,including testing for ground faults? <br /> 4—Yfes U No* I Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ( s ❑ NO Was accuracy of system product level readings tested? <br /> (,Oes Cy Nu* 7Was accuracy of system water level readings tested? <br /> (--)-Yes ❑ No* Were all probes reinstalled properly? <br /> ( 'Yes U No* Wert all items on the equipment manufacturer's maintenance checklist completed? <br /> In the See tlon H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): O Check this box if LLDs are not installed. <br /> co let e the following checklist: _ <br /> Yes Q No* For equipment start-up or annual equipment scwNfication, was a leak simulated to verify LLD performance <br /> ❑ N/A (Check all that apply) Simulated leak rate: W3 g.p.h.; Q 0.1 g.p.h ; ❑0.2 g.p.h. <br /> iCJ Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> )'es ❑ No* Was the testing apparatus properly calibrated? <br /> 91(Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> C] N/A <br /> ❑ Yes ❑ * For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> lK N/A <br /> ❑ Yes U�* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> Gd"N/A or disconnected? <br /> ❑ Yes p For electronic LLDs,docs the turbine automatically shut off if any portion of the mont.oring system malfunctions <br /> O'N/A or fails a test? <br /> ❑ Yes ❑ For electronic M.Ds,have all accessible wiring connections been visually inspected? <br /> �3 N/A <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Seelion H, below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 0310[ <br />