My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1987 - 2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
244
>
2300 - Underground Storage Tank Program
>
PR0231137
>
COMPLIANCE INFO 1987 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 1:16:56 PM
Creation date
11/8/2018 10:22:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987 - 2007
RECORD_ID
PR0231137
PE
2361
FACILITY_ID
FA0001554
FACILITY_NAME
MIRACLE MILE MARKET
STREET_NUMBER
244
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13708014
CURRENT_STATUS
01
SITE_LOCATION
244 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HARDING\244\PR0231137\COMPLIANCE INFO 1987 - 2007 .PDF
QuestysFileName
COMPLIANCE INFO 1987 - 2007
QuestysRecordDate
7/21/2016 3:39:19 PM
QuestysRecordID
3146929
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECONDARY PIPE TESTING <br /> Test Method By: Manufacturer • Industry Standard O Professional Engr. O Other(see below) <br /> Test Method Uses: • Pressure ,,r Vacuum O Hydrostatic O Other(see below) <br /> Measuring Equipment Used: Pressure Gauge (range 0 to 10 psig) <br /> Description PI in 'Run #1 Pi in !Run #2 <br /> Pipe Manufacturer Smith Smith _ <br /> Pipe Type FRP _ FRP <br /> Primary Pipe Diameter(inches) 21 _ 2" <br /> Secondary Pipe Diameter(inches) 3" 3" <br /> Product Stored I' Gasoline-87 Gasoline-91 <br /> Method of secondary pipe isolation Termination Boot Termination Boot <br /> Location of secondary pipe isolation Sump Sump <br /> Estimated length of piping run(feet) 35 35 <br /> (include length of branch runs) <br /> Wait time for pressure to stabilize(hr.min) 0:10 0:10 <br /> Test start eme 8:40 AM 10:00 AM <br /> Initial pressure( 5 5 <br /> Test end time 9:40 AM 11:00 AM <br /> Final pressure(psig) 5 5 _ <br /> Test duration(houre:minutes) 1:00 1:00 <br /> Change in pressure(psi ) -I 0 0 <br /> Pass/Fail threshold(psig) 0.5 0.5 <br /> TEST RESULT PASS PASS <br /> Comments: <br /> ccs 2002 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.