My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1987 - 2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
244
>
2300 - Underground Storage Tank Program
>
PR0231137
>
COMPLIANCE INFO 1987 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 1:16:56 PM
Creation date
11/8/2018 10:22:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987 - 2007
RECORD_ID
PR0231137
PE
2361
FACILITY_ID
FA0001554
FACILITY_NAME
MIRACLE MILE MARKET
STREET_NUMBER
244
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13708014
CURRENT_STATUS
01
SITE_LOCATION
244 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HARDING\244\PR0231137\COMPLIANCE INFO 1987 - 2007 .PDF
QuestysFileName
COMPLIANCE INFO 1987 - 2007
QuestysRecordDate
7/21/2016 3:39:19 PM
QuestysRecordID
3146929
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> Required by Sections 2632(d) and 2641(h) CCR. <br /> Facility Name '�—T �5cttjpp �� <br /> Facility Address Z/q 02�; - fZ, 1,46 A a �� ,r C F<A 914002, <br /> A Describe the frequency of performing the monitoring: <br /> Tank ' - <br /> LL_ 1S t x JT LLil <br /> {'I�PFTEG <br /> Piping B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> Taank �19` ri i r G c ,C--f << (—<,,�.�a� i <br /> riping_r= t4Ti�� rP_ tJ1l <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> D. List the name(s) and titles) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment:/L`L;t'li <br /> E. Reportinlg format for monitoring: <br /> Tank I • L 1-,I I� V-. (Y r1-%'`-'l'=� A.1 L� 'i tu�� < <.t+r=c: <br /> Piping <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less than every 12 months: C>;-t _ c 1') ? *T-1 C:y kr i T-F4i g <br /> G. Describe the training necessary for the operation of UST system, including piping, <br /> and the monitoring equipment:.S;e,j rc..' ✓e i `-}-r� (' C �u <br /> SC'i ti=c fli1P l i' \ J Au c <br />
The URL can be used to link to this page
Your browser does not support the video tag.