My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
15600
>
2300 - Underground Storage Tank Program
>
PR0231585
>
INSTALL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 11:18:19 AM
Creation date
11/8/2018 10:22:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1998
RECORD_ID
PR0231585
PE
2361
FACILITY_ID
FA0000174
FACILITY_NAME
JOES TRAVEL PLAZA
STREET_NUMBER
15600
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19620079
CURRENT_STATUS
01
SITE_LOCATION
15600 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HARLAN\15600\PR0231585\INSTALL 1998.PDF
QuestysFileName
INSTALL 1998
QuestysRecordDate
12/20/2017 9:22:38 PM
QuestysRecordID
3752004
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SENSOR IN§MLLATION INSTRUCTIONS <br /> WANK MONITORS 3 AND 4 <br /> B. INSTALLATION OF FLOAT SWITCH. WEATHERPROOF <br /> JUNCTION BOX <br /> 1. Lower the float switch assembly into the riser pipe until I3 PER PROBE) <br /> the float switch touches the bottom of the tank. Refer to ire_ RIGI <br /> Figure 1. CONDUIT <br /> ' Elk <br /> 7O TO <br /> MONITOR SENSOR <br /> m,. + whi <br /> m. ,. Figure 2. Tank Monitor 4 and Tank Monitor 3 Four-Tank <br /> (Direct-Connect) System Sensor Wiring Installation Diagram <br /> ro� <br /> u:< aR Rte, NOTE: DO NOT SEAL WIRE NUT CONNECTIONS AT <br /> THIS TIME. Epoxy sealant, furnished with each <br /> sensor,should only be installed after warranty checkout <br /> by an authorized Gilbarco Tank Monitor 3 or Tank <br /> Monitor 4 distributor. <br /> 5. For Tank Monitor 3 Eight-Tank (Indirect-Connect) <br /> System: <br /> oR <br /> a. Using wire nuts, connect the two-wire sensor cable to <br /> the correct leads on the ESA module. (Refer to Figure <br /> 3, "Tank Monitor 3 Eight Tank (Indirect Connect) <br /> System Sensor Wiring Installation Diagram.°) Be sure <br /> to observe color codes for proper polarity hookup to <br /> the Tank Monitor 3 monitor. <br /> NOTE: DO NOT SEAL WIRE NUT CONNECTIONS AT <br /> THIS TIME Epoxy sealant, furnished with each <br /> sensor,should only be installed after warranty checkout <br /> Figure 1. Sensor Dimensions and Installation Requirements-- by an authorized Gdbarco Tank Monitor .3 or Tank <br /> Steel Tank Monitor distributor. <br /> 2. Keeping the cable taught,secure the sensor assembly in - � <br /> place by attaching the grip cord. <br /> NOTE: The float switch assembly should not hang by the <br /> cable, but should rest lightly on the bottom of the tank <br /> 10 upap. 6FASOR,R <br /> supported by the cable. .' <br /> 3. Secure the riser cap to the riser pipe. <br /> 4. Tighten the cable bushing nuts on the riser cap and <br /> junction box to ensure a water-tight seal at the cable entry. <br /> S. For Tank Monitor 4 and Tank Monitor 3 Four-Tank <br /> (Direct-Connect)Systems: •°� <br /> a. Using wire nuts, connect the two-wire sensor cable to <br /> the field wires in the sensor junction box. Be sure to Figure 3. Tank Monitor 3 Eight-Tank (Indirect-Connect) <br /> observe color codes for proper polarity hookup to the System Sensor Wiring Installation Diagram <br /> Tank Monitor monitor. (Refer to Figure 2, RTank <br /> Monitor 4 and Tank Mouitor3 Four-Tank(Direct-Con- <br /> nect) Systems Sensor Wiring Installation Diagram.") <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.