My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
15600
>
2300 - Underground Storage Tank Program
>
PR0231585
>
INSTALL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 11:18:19 AM
Creation date
11/8/2018 10:22:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1998
RECORD_ID
PR0231585
PE
2361
FACILITY_ID
FA0000174
FACILITY_NAME
JOES TRAVEL PLAZA
STREET_NUMBER
15600
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19620079
CURRENT_STATUS
01
SITE_LOCATION
15600 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HARLAN\15600\PR0231585\INSTALL 1998.PDF
QuestysFileName
INSTALL 1998
QuestysRecordDate
12/20/2017 9:22:38 PM
QuestysRecordID
3752004
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19. Piping (cross-sectional #Aram, including connections to tank and dispensers). <br /> (A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br /> Restricts delivery of flow to tank [Section 2635 (b) (2) (B) or (C)], or <br /> -)ILD Provide positive shut off of flow to the tank at no more than 95 % (Section 2635 (b)(2)(C)], or <br /> (B) Vapor recovery piping designed so it cannot contain Liquid phase product, or <br /> (C) Suction piping (below grade piping operates at Less than atmospheric pressure) [Section 2636 (a) (3)3 <br /> Sloped so contents of the pipe will drain back into the storage tank if the suction is <br /> released. <br /> No valves or pumps installed below grade. <br /> Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br /> (D) N�A-- Corrodible underground piping protected against corrosion (Section 2636 (b)). <br /> (E) _ Underground primary piping will meet alL of the following requirements <br /> Primary piping in contact with hazardous substance under normal operation conditions shall be: <br /> instaLLed inside a secondary containment system in the form of: secondary pipe_Vault or <br /> _Lined trench to be sloped to a collection sump at the Low point of the piping. _ <br /> Primary piping and secondary containment systems will be installed in accordance with industry <br /> code of practice and voluntary consensus standards.. <br /> Lined trench used as secondary containment <br /> Material compatible with the substance stored. <br /> Covered and capable of supporting any expected vehicular traffic. <br /> (F) Underground piping with secondary containment will be equipped and monitored as folLows: <br /> Secondary containment will be equipped with a continuous monitoring system connected to an audible <br /> and visual alarm system. <br /> Automatic line Leak detectors will be installed on pressurized piping <br /> Manufacturer: Model: <br /> Annual monitoring wilt be conducted on the pressurized piping with secondary containment. <br /> Annual Line tightness test will not be required if the continuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected and when the continuous monitoring system <br /> fails or is disconnected. <br /> 20. State Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br /> 21. _ PLan review and operating permit fees paid. <br /> 22. What is the approximate depth to ground water: I�_l <br /> (incLude source of information - borehole Logs, monitoring weLl data, water <br /> studies, etc.) <br /> 23. \10"- Total number of tanks on site after installation: 3 ut!k� ",jest 4 a a-yc &a-:v4 <br /> 24. x County/City Fire District and Building Department notified. <br /> 25. In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> responsibility [in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> Requirements] as an owner or operator to submit a workplan to PHS-EHD Site Mitigation Unit prior to initiating any <br /> assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br /> The owner or operator must^acknowledge <br /> ,this responsibility for workplan submittal by signature and date below. <br /> Name �07e� ��i�Q,G �1 • //9/�+U/Tjtle /j?2 & Date <br /> CONDITIONS OF APPROVAL: <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.