My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
15600
>
2300 - Underground Storage Tank Program
>
PR0231585
>
INSTALL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 11:18:19 AM
Creation date
11/8/2018 10:22:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1998
RECORD_ID
PR0231585
PE
2361
FACILITY_ID
FA0000174
FACILITY_NAME
JOES TRAVEL PLAZA
STREET_NUMBER
15600
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19620079
CURRENT_STATUS
01
SITE_LOCATION
15600 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HARLAN\15600\PR0231585\INSTALL 1998.PDF
QuestysFileName
INSTALL 1998
QuestysRecordDate
12/20/2017 9:22:38 PM
QuestysRecordID
3752004
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
���a� QA9.10 . Q IMILILA720H a a[EMUQCIE <br /> BANKS Fr C <br /> PETROLEUM EQUIPMENT 2403 FAST BELMONT.FRESNO.CALIFORNIA 99701 +(209) 485-3456 +LICENSE N0.,3B3550 . <br /> November 4, 1997 1 <br /> San Joaquin County <br /> Public Health Services ' <br /> 304 East Weber Avenue, Third Floor ' <br /> Stockton, CA 95202 <br /> Arm. Robert vlcClellon <br /> RE. Proposed tank remove and installation <br /> Site: Joe's Place <br /> 15600 South Harlan Road <br /> Lathrop, CA <br /> Dear 'vlr McClellon, <br /> The following are the answers to the issues that volt had talked about in vour letter dated October 21, <br /> 199 <br /> Removal: <br /> 1. The site safety plan for the installation is enclosed with this letter. <br /> 2 We will be having the soil samples analyzed for leaded fuels. <br /> 3. We will be using a Baker tank to handle any contaminated water the might be at the project. <br /> Installation: <br /> 1 If the hole does lave a high water table, as has been memm-ned, we will: b:: using the over burden of <br /> the backfill material and concrete slab to hold the tanks in place. There is an attached page for the <br /> engineering of the hold down. <br /> The probes that will be used for the Giibarco E VIC rank monitor is the PA0265? K'(0000 Enclosed <br /> is a copy of page 439 of SWRCB LG 113-10. <br /> 3. Because of the requirements for sensors in the dispenser pans we will be changing to Bravo pans. <br /> 4. With the change to Bravo pans we will not be able to use the flexible piping. We will be installing <br /> A.O. Smith fiberglass piping. We will be usingA-0. Smith fiberglass piping for the double <br /> containment system. <br /> 5. We will be using Red Jacket leak detec_ors for the piping mechanical leak detectors. TheModel <br /> number is a FX-2. <br /> Sincerely. <br /> ohn V Moore <br /> Banks & Co. <br /> Vice President <br /> ,PEI. <br /> LUBE EQUIPMENT . ELECTRONIC FUEL DSPENSINC . PIR COMPRESSORS . AUTO.TRUCK.d BUS LATS . XARD-LOCX&XEYLOCXSVSTEFIIS . 40OV61Um(,ERCY0uN0TANXS . VISES . REELS <br /> RETAIL 3 COMMERCIAL FUEL PUMPS -SERVICE STATION NOZZLES B PUMP NOSES VAPOR RECOVERY .LIGHTING SYSTEMS VALVES B TANK FITTINGS . 40 RECULATORS&FILTERC PARTS wQSHERS <br /> STEAM CLEANERS B PRESSURE WASHERS . NOTTANXS . HPNDTOOLS . AIRTOOLS . EXHAUSTSVSTEITLS . FLACS ELLCTRKMOTCQS - FIELDERECTED TANKS . CARwASHEOUIPMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.