My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
15600
>
2300 - Underground Storage Tank Program
>
PR0231585
>
INSTALL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 11:18:19 AM
Creation date
11/8/2018 10:22:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1998
RECORD_ID
PR0231585
PE
2361
FACILITY_ID
FA0000174
FACILITY_NAME
JOES TRAVEL PLAZA
STREET_NUMBER
15600
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19620079
CURRENT_STATUS
01
SITE_LOCATION
15600 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HARLAN\15600\PR0231585\INSTALL 1998.PDF
QuestysFileName
INSTALL 1998
QuestysRecordDate
12/20/2017 9:22:38 PM
QuestysRecordID
3752004
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ <br /> A polyethylene based multi-layer rM <br /> surrounds the primary dual Poly �ech P 1�5 C <br /> sandwich construction on Poly- <br /> surfacTechT1' ofth SC. Ribs <br /> mmnthe <br /> jacketrior controlled <br /> PleAvib l�surface of the containment jacket J <br /> ty <br /> conform to the base pipe under the <br /> weight of back fill. This creates a P <br /> I �11 <br /> secondary containment passageway g <br /> that, on its own, easilp contains 40 <br /> psi submersible pump pressures. <br /> P-175-SC comes off the reel with the <br /> a . . <br /> secondary containment jacket in � E <br /> place, so the contractor can <br /> } <br /> simultaneously install primary and <br /> secondary piping. <br /> ■ The simultaneous ivallatio i of <br /> primum and iecondar p,pmg cields a » <br /> permanent eosteffectivcinstallation r ?_ <br /> ■ Pipe construction employs a dual <br /> polymer sandwich wall with braided �� <br /> reinforcement <br /> ■ Proprietary permeation barrier <br /> technologv enhances environmental <br /> security <br /> ■ 100 psi working pressure rating and a <br /> 900 psi burst strength insure system <br /> integrity <br /> ■ Nylon 12 pipe liner,the standard used <br /> for all automotive fuel lines,protides <br /> multi-fuel compatibility including <br /> alcohols and alcohol and gasoline - -- — -- - <br /> blends <br /> ■ Controlled flexibility permits <br /> continuous piping runs for fast,easy <br /> installation in any season <br /> ■ High-level environmental security is <br /> implicit in systems where 11-175-SC is <br /> used in'conjunction with other Poly- <br /> Tech"'piping system products <br /> - AdvanCedPolymer Joe's Place, 1X600S. Harlan Road,Lathrop <br /> Technology, Inc. Phase 2 UST Installation <br /> 800/262-9899 By:Banks&Co.,(209)485-3546 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.