My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
15600
>
2300 - Underground Storage Tank Program
>
PR0231585
>
INSTALL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 11:18:19 AM
Creation date
11/8/2018 10:22:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1998
RECORD_ID
PR0231585
PE
2361
FACILITY_ID
FA0000174
FACILITY_NAME
JOES TRAVEL PLAZA
STREET_NUMBER
15600
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19620079
CURRENT_STATUS
01
SITE_LOCATION
15600 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HARLAN\15600\PR0231585\INSTALL 1998.PDF
QuestysFileName
INSTALL 1998
QuestysRecordDate
12/20/2017 9:22:38 PM
QuestysRecordID
3752004
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> iULD CONSIDER <br /> ' E FITS OF <br /> ' BERGLASS PIPING <br /> ' Iia, ,•;,� �-+;� `"� .. <br /> R <br /> P �? <br /> �♦ H <br /> ' RED THREAD II double-wall secondary containment piping helps When the termination concentric reducer with a tap is installed in the <br /> installers meet EPA regulations and protect the environment. sump,the complete system will be pressure testable. <br /> I <br /> High Flow Capacity shows that they are compatible for use or field-made tapers may bejoined with <br /> ' RED THREAD II pipe has a greater with all concentrations of ethanol and belled fittings. For proper tapering, <br /> flow capacity than many other pipes methanol, including 100° at 75°F. carefully follow the operating instruc- <br /> with the same O.D.This is because its Adhesive kits contain epoxy resin tions (Bulletin No. F6600) included <br /> high-strength, fiberglass construction and hardener in separate containers, with the tapering tool kit. <br /> ' provides a smoother I.D.and can pro- joint cleaner, mixing stick, paint brush, For detailed installation instructions <br /> videalarger l.D.forspecifiedpressures. and paper towels. covering assembly, burial, testing and <br /> A detailed instruction sheet is also repair, refer to Smith Fiberglass Products <br /> Thermal Conductivity <br /> ' included with each kit.Referto approp- Manual No. B2160. <br /> The thermal conductivity of RED riate installation bulletin for additional Handling d St <br /> THREAD II pipe is only a fraction of that information including cure cycle times. g anStorage <br /> of steel following these instructions will insure RED THREAD 11 pipe is packaged in <br /> ' Low Coefficient of fast and easyassemblyof RED THREAD compact bundles of four to eight <br /> II piping systems. lengths. Bundles of RED THREAD II <br /> Linear Expansion pipe can be safely stored on level ground <br /> The coefficient of expansion of RED Tapering or on racks with 10-foot(or less)support <br /> ' THREAD II pipe is 1/5 to 1/6 that ofthermo- When RED THREAD II pipe is cut to spacing.-Reasonable care must be used <br /> plastic pipe and only twice that of steel. length on the job site,the cut end must in handling RED THREAD n pipe. Do <br /> /Adhesives be retapered.A field tapering tool avail- not drop or throw RED THREAD II pipe <br /> ' Designed specifically for the RED able from Smith Fiberglass Products is on the ground or drop rocks or other <br /> THREAD II piping system,the adhesives used for this purpose.The tool quickly heavy objects on it. Follow the proper <br /> required for joining product and con- applies the proper taper by a shaving procedures for inspecting piping <br /> tainment piping are Smith Fiberglass operation — similar to a pencil shar- materials as stated in Smith.Fiberglass <br /> ' Products DS-7000- series adhesives. pener. Plain unthreaded field-made - Products Manual No. B2160. <br /> For RED THREAD IIA product see tapers tan be joined with factory For industry reference,see API Publication 1615/87 <br /> "Installation of Underground Petroleum Storage Sys- <br /> Manual No. 82160 for adhesives. installed threaded T.A.B.joint coupled (ems,"and PEI/RP100-90"Recommended Practicesfor <br /> ' Testing of the adhesive systems ends.Either factory-made T.A.B.spigots Installation of Underground Liquid Storage Systems.13 <br /> 3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.