Laserfiche WebLink
MEETS 1994 ICB❑ UBC <br /> SEISMIC ZONE 4 <br /> -� INNER TANK: PER U.L. <br /> OUTER TANK: PER U.L. <br /> INTERI❑R: BARE, <br /> O p p p 00 O O O P CLEAN OF DEBRIS. <br /> EXTERIOR: WHITE <br /> MATERIAL PMI CONSTRUCTION CCI,FORN TO <br /> 96"ID — — — — — — — ERW ISELSONQS O ATORIIES STANDARD <br /> A B C D E F M 6 H I J PROTECTED ABOVEGROUND TAN, <br /> 18' IB' 18' 18" 30" 18' 18' IB' <br /> EXCEEDS ALL REQUIREMENTS IF 1994 <br /> — — — IFCI (FC STANDARD 79-7.(TEST <br /> CERTIFIED BY UL. <br /> \ BULLET RESISTANT UNDER 1994 IFCI UFC <br /> dBfD STANDARD 79-7. <br /> I 1 I I IMPACT RESISTANT UNDER 1994 IFCI UFC <br /> STANDARD 79-7. <br /> MODERN UL.LABEL FOR INSULATED SECONDARY <br /> \ FIREGUARD / I I CONTAINMENT AG TAN IS REQUIRED <br /> S <br /> \ ADR TEST AT NDT LESS THAN 5 PSI MR <br /> MORE TUWN 7 PSI PRIMARY TANK TO BE <br /> TESTED ALONE SECONDARY I"TO BE <br /> PRESSOE TESTED VITH PRESSURE DI <br /> PRIMARY TAW, THIS SMALL BE ACCCM- <br /> K K PLISFED BY IILEEDMG PSR FROM THE <br /> PRIMARY TRIC INTO THE SECONDARY I" <br /> AT NO TIME SHALL PRESSURE IN <br /> SECONDARY TANK EXCEED <br /> M 1 4--F--7m—ANVAY PRESSURE IN PRIMARY TAW. <br /> K 2 1 1' IFNIPT IPLUGGED <br /> J 1 1 2' hNPT IMONITOR ONE (I) nd.n FGI0000 <br /> 7'-6 3/4' I 1 1 4' JMNPT <br /> 4 1/2' 9' G 1 4' MPH 1 4' INT T <br /> � MODERN NEEDING(0.OF CRIFORN'IA,INC. <br /> � � <br /> F 1 8' MDPT SEC. E-VENT en�xo.c.�Ntmnnu mo-zn-ossa <br /> 4 9" 5'-4 3/4' 9' E 1 8' MrPT PRIM E-VENT <br /> 1 1/8' HOLES FOR D 1 4' MNPT <br /> BASE PLATE DETAIL 7/8' ANCHOR BOLTS C 1 4' MDPT IRN TAW <br /> 2- <br /> B I 4' MNPT <br /> A 1 2' FNPT PLUGGED n..er Me ua 5/19/97 vic raME <br /> SIZE I O.D. LENGTH WEIGHT r>nra REon sNa Tw IAFl s a,,.e. a,o wcm FG10 <br /> 10.000 103' 7'-7' 34,380 crHrrnI D F OF OPENINGS <br /> ,Toe's Place, 15600 S. Harlan Road,Lathrop <br /> Phase 1 AST Installation <br /> By:Banks&Co.,(209)485-3546 <br />