Laserfiche WebLink
MONITORING ALTERNATIVE 7 <br />Implementation of this monitoring alternative will require <br />Weekly Tank Gauging and Annual Tank Integrity testing. If <br />this monitoring alternative is chosen implementation should <br />be carried out as follows: <br />1) <br />Perform the initial tank integrity test/tests to confirm <br />that the tank/tanks do/does not leak at the time of <br />implementation of the monitoring alternative. Integrity <br />testing must be done within one year prior to <br />implementation of the monitoring alternative. Based on <br />information obtained from facility personnel all/the <br />tanks/tank at this facility have passed an integrity test <br />within the last year. 7 k)&F fl A.)(' S uta /u I iT£n St NC,6 I X78O' <br />Weekly tank gauging will require that the tank be secured <br />Sfor <br />a period no less than 1-s. During this time no <br />�2) <br />inputs or withdrawals will be allowed from the tank. The <br />uel level at the beginning and end of this period will be <br />measured manually using a calibrated stick (or using <br />automatic liquid level sensing equipment) with an accuracy <br />of X gallons. Weekly gauging shall be as specified in <br />Section 2641, Alternative 7 in the Underground Storage Tank <br />Regulations. <br />3) <br />Tank integrity testing to determine that total product loss Cv-&-4-10 <br />from the tank does not exceed 0.05 gallons per hour, shall <br />be performed yearly. Integrity testing shall be carried <br />out as described in Section 2543 of the Underground Storage <br />Tank Regulations. <br />