My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
23500
>
2300 - Underground Storage Tank Program
>
PR0231636
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2021 1:16:42 PM
Creation date
11/8/2018 10:22:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231636
PE
2381
FACILITY_ID
FA0003869
FACILITY_NAME
DEUEL VOCATIONAL INSTITUTION*
STREET_NUMBER
23500
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23912001
CURRENT_STATUS
02
SITE_LOCATION
23500 KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\K\KASSON\23500\PR0231636\COMPLIANCE INFO 1986 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 1986 - 2015
QuestysRecordDate
10/10/2017 4:11:16 PM
QuestysRecordID
175458
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING ALTERNATIVE 7 <br />Implementation of this monitoring alternative will require <br />Weekly Tank Gauging and Annual Tank Integrity testing. If <br />this monitoring alternative is chosen implementation should <br />be carried out as follows: <br />1) <br />Perform the initial tank integrity test/tests to confirm <br />that the tank/tanks do/does not leak at the time of <br />implementation of the monitoring alternative. Integrity <br />testing must be done within one year prior to <br />implementation of the monitoring alternative. Based on <br />information obtained from facility personnel all/the <br />tanks/tank at this facility have passed an integrity test <br />within the last year. 7 k)&F fl A.)(' S uta /u I iT£n St NC,6 I X78O' <br />Weekly tank gauging will require that the tank be secured <br />Sfor <br />a period no less than 1-s. During this time no <br />�2) <br />inputs or withdrawals will be allowed from the tank. The <br />uel level at the beginning and end of this period will be <br />measured manually using a calibrated stick (or using <br />automatic liquid level sensing equipment) with an accuracy <br />of X gallons. Weekly gauging shall be as specified in <br />Section 2641, Alternative 7 in the Underground Storage Tank <br />Regulations. <br />3) <br />Tank integrity testing to determine that total product loss Cv-&-4-10 <br />from the tank does not exceed 0.05 gallons per hour, shall <br />be performed yearly. Integrity testing shall be carried <br />out as described in Section 2543 of the Underground Storage <br />Tank Regulations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.