Laserfiche WebLink
~ Integrity Tank Testing Systems, Inc. <br /> I T T S ! <br /> Agreement No. SA 3005 <br /> Work Order No. GST 652 <br /> Horner Ezy Chek System <br /> TEST DATA E RESULTS OF TESTS <br /> DEUEL VOCATIONAL 1 <br /> OWNER/OPERATOR INSTITUTE TANK LOCATION West of shop , north tank <br /> AGENT OFFICE OF THE STATE ARCHITECT AGENT Bob Crump <br /> ADDRESS 1500 Fifth Street ADDRESS 23500 Kasson Road <br /> CITY, STATE Sacramento , CA 95814 CITY, STATE Tracy , CA 95376 <br /> TELEPHO14E ( ) TELEPHONE (209 ) 835-4141, Ext . 4240 <br /> SCHEDULED DATE OF TEST 10-2-86 SCHEDULED ARRIVAL TIME 7 : 00 A.M. <br /> TEST TANK PRODUCT WATER TEST INCHES ABOVE WITHIN NFPA <br /> 9 CAPACITY CONTAINED PRESENT RESULTS TANK TOP GUIDELINES <br /> OF .05 <br /> 1 2000Reg_ Gasoline 11�' See remarks _-_____ See remarks. <br /> ------- ---------- <br /> -- -------- ------------ ----- ------- -------- ---------- <br /> -- -------- ------------ ----- ------- -------- ---------- <br /> WORKSHEET COPY ATTACHED FOR SUBMITTAL TO GOVERNMENT AGENCY. <br /> Could not conduct test. Product dropping rapidly from standpipe. <br /> REMARKS Added about 35 or 40 gallons to system; product continued to drop . <br /> Set up standpipe on gasoline tank and, when adding the product to the <br /> system, the product in the DIESEL tank began to increase in the standpipe. <br /> Thought that because the gas tank was end-to-side with the diesel that one <br /> was affecting the other. Pulled the diesel tank down about 20 gallons , or <br /> about 15" from top of fill. When I added about 30 gallons to GAS tank, <br /> the fill pine on the DIESEL tank overflowed and product continued to drop <br /> in the gas stand pipe. <br /> I feel the Phase II vapor recovery lines are tied together because <br /> I found out (after doing this several hours) that the DIESEL tank is an <br /> old REGULAR -AS ank _ I feel chic has been a problem in the past because <br /> the man in charge of the garage said they 've had a problem with the equip- <br /> m n in the Past w,rb Lh-e-�uxa-tors and tbouebt it was water in the tanks . <br /> Recommend uncovering systems & breaking vapor lines and retesting. <br /> TESTING CONTRACTOR: Integrity Tank Testing Systems, Inc . <br /> 166 Frank !±sst Circle, Stockton , Ca . 95206 <br /> 1 800 262 6376 <br /> CONTRACTORS TECHNICIAN E <br /> Frank Keser <br /> DATE OF TEST 10-2-86 <br /> 800 262 TEST 166 Fronk West Circle Stockton, CA 95206 (209) 466-8036 <br />