My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
23500
>
2300 - Underground Storage Tank Program
>
PR0231636
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2021 1:16:42 PM
Creation date
11/8/2018 10:22:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231636
PE
2381
FACILITY_ID
FA0003869
FACILITY_NAME
DEUEL VOCATIONAL INSTITUTION*
STREET_NUMBER
23500
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23912001
CURRENT_STATUS
02
SITE_LOCATION
23500 KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\K\KASSON\23500\PR0231636\COMPLIANCE INFO 1986 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 1986 - 2015
QuestysRecordDate
10/10/2017 4:11:16 PM
QuestysRecordID
175458
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITTIntegrity Tank Testing Systems, Inc. <br /> September 24 , 1986 <br /> Mr . Mike Warner <br /> Department of General Services <br /> OFFICE OF THE STATE ARCHITECT <br /> 1500 Fifth Street 9 r sr ��` `/ ��� ✓"✓ <br /> Sacramento, CA 95814 Ste" �� ! , ��/✓ <br /> Dear Mr . Warner: <br /> Please note the attached, sketch and comments regarding <br /> the four 12 ,000 gallon A6 bunker fuel tanks at DVI . <br /> Due to the opportunities that exist with these four <br /> tanks , we question the feasibility of performing proper <br /> precision tank tests . <br /> If it is your desire to have the tests performed , the <br /> material will have to be brought to a liquid condition not <br /> to exceed 1100 F . The manways , If they exist, would have <br /> to be exposed and made ventable . The drop fill tubes would <br /> need confirmation that it stops at the tank top . Valving <br /> would have to be free so that positive closure can be made . <br /> Due to the criteria Involved , we suggest that one tank <br /> at a time be done so that ground temperature bleed does not <br /> come into play during the testing . <br /> Please advise your desires . <br /> Sincerely, <br /> W. N. Savage <br /> Copy : Bob Crump <br /> Deuel Vocational Institution <br /> 800 262 TEST 166 Frank West Circle Stockton, CA 95206 (209) 466-8036 <br />
The URL can be used to link to this page
Your browser does not support the video tag.