Laserfiche WebLink
Monitoring System Certification <br /> 1 / UST Monitoring Site Plan <br /> Site Address: W i ne �'o,in��h //!f ket , Ynapt ,(u lid' CW 4574 yo <br /> F7 <br /> C' . . . . . : . . . «o. : . . . . . . . . : <br /> C �''G r` <br /> S' <br /> . . . . . . . . . . . . . . . . <br /> . �. . <br /> �_ . . . . . . . . . . . . . . . . . <br /> y . . . . . . . . . . . . . . . . . . . <br /> . . . . t�3 ] . . . . � . ... . . 1;j , * , <br /> . . . . . . . . . . . . . <br /> . : . .1^O 1 F��L 9pPp�� ..av�a-/ . . . . . . . . . <br /> J�a�• 1 <br /> �.'Y26 . <br /> S� .�. . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Date map was drawn.-Lc—, /26 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring <br /> System Certification, On your site plan show the general layout of tanks and piping Clearly identify locations of the following <br /> equipment, if installed; monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spill <br /> containers, of other secondary containment areas; mechanical or electronic line leak detectors;and in-tank liquid level probes(if used <br /> for leak detection). in the space provided,note the date this Site Plan was prepared. <br /> Page 4 of 4 <br /> UN-036-4/4 <br /> www.onidomorg <br /> Rev.0U17/08 <br />