My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
1111
>
2300 - Underground Storage Tank Program
>
PR0506724
>
COMPLIANCE INFO 2008 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 10:12:19 AM
Creation date
11/8/2018 10:22:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2015
RECORD_ID
PR0506724
PE
2361
FACILITY_ID
FA0007594
FACILITY_NAME
WINE COUNTRY STATION/7-ELEVEN
STREET_NUMBER
1111
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04931056
CURRENT_STATUS
01
SITE_LOCATION
1111 E KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\K\KETTLEMAN\1111\PR0506724\COMPLIANCE INFO 2008 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2008 - 2015
QuestysRecordDate
6/27/2018 4:14:35 PM
QuestysRecordID
3926585
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.Dec 15 09 09: 50a Elite 0V Contactors 120946342 p . G <br /> Installation • <br /> Introduction <br /> This manual contains procedures to install a Module Expansion Board Kit in an existing TLS-350 <br /> Series Console This manual assumes that all preliminary site preparation is completed,and that wiring <br /> from the console to any external devices being connected to an expansion module is in place. <br /> Related Manuals <br /> If this is a new installation or site preparation is necessary,refer to: <br /> 576013-879 TLS-350&TLS-350P Site Prep and Installation Guide <br /> Contractor Certification Requirements <br /> Veeder-Root requires the following minimum training certifications for contractors who will install and <br /> setup the equipment discussed in this manual: <br /> Level 1 Contractors holding valid Level 1 Certification are approved to perform wiring and <br /> conduit routing,equipment mounting,probe and sensor installation,tank and line <br /> preparation,and line leak detector installation. <br /> Level 2/3 Contractors holding valid Level 2 or 3 Certifications are approved to perform instillation <br /> checkout,startup,programming and operations training,troubleshooting and servicing <br /> for all Veeder-Root Tank Monitoring Systems,including Line Leak Detection and <br /> associated accessories. <br /> Warranty Registrations may only be submitted by selected Distributors. <br /> Safety Symbols <br /> The following safety symbols may be used throughout this manual to alert you to important safety <br /> hazards and precautions <br /> Electricity Turn Power Off <br /> O Highvoltage exists and is sup- Live power to a device creates a <br /> .! plieded to,the device.A potential L• potentia]shock hazard.Tum OH <br /> fJ shock hazard exists. E=o power to the device and associated <br /> accessories when servicing the unit. <br /> Explosive Flammable <br /> Fuels and their vapors are extremely Fuels and their vapors are extremely <br /> explosive if ignited. , flammable. <br />
The URL can be used to link to this page
Your browser does not support the video tag.