Laserfiche WebLink
SW'RCB, January 3002 � • Page `�of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: 7 Sump Manufacturer C` Industry Standard :Professional Engineer <br /> - Outer (5p,,eciJy) <br /> Test Method Used: ' Pressure Vacuum I-Icdrostatic <br /> Other(Specrfi) <br /> Test Equipment Used: Gf 1!�w,i �_",�( , ,1„ . . f_r <br /> r <br /> � d, --� ,- Equipment Resolution , np zS- <br /> Sump# Sump# 11 Sump# j Sump# <br /> Sump Diameter: q 2,1 + 4 ? 1 t ycLr r <br /> Sump Depth: �, t ! / , ✓a z n <br /> Sump Material: ✓r, fzti <br /> S:'& O�rS <br /> 7/ <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: S-11 <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: 112 It / 1 t ' 7 t <br /> Condition of sump prior to testing: U/r <br /> Portion of Sump Tested' (t)? rY�,:.a 6'tt " (! <r 1 14 23 " 7f tv L,)-o, <br /> Does turbine shut down when <br /> sump sensor detects liquid(both �YYes ❑No ❑NA t Yes No CNA 1-,Yes ❑No L:NA Eyes --No I__NA <br /> product and water ? <br /> Turbine shutdown response time i ( Ic,r i�!,_! Ile <br /> Is system programmed for fail-safe <br /> shutdown?* Yes ❑ ;<"No C NA r Yes L No L NA r 2 4es No C NA C Yes ':[ No CNA <br /> Was fail-safe verified to be <br /> o erational?o ❑Yes ri4a No 71CF_-,NA C Yes r0'No NA Yes �;.No CNA C YesNo r NA <br /> Wait time between lying <br /> pressure/vacuu water d starting i <br /> test: <br /> Test Start Time: t'. e": Iz ; s-U 12- ', t /a <br /> Initial Reading(RI): ( { ( , r ' t F�r;a-- Circ!;, <br /> Test End Time: <br /> Final Reading(RO: F7r 54 /' (p i <br /> Test Duration: <br /> Change in Reading(RF-Ri): <br /> Pass:Fail Threshold or Criteria: vrJ ! <br /> Test Result: © Pass ❑ Fail (T Pass I I Fail _1 Pass fl Fail ❑ Pass ❑ Fail <br /> Was sensor removed for testing? 7'Yes -No NA 43 Yes .:No -NA Yes No -NA Yes No C A <br /> Was sensor properly replaced andYes No NA .' Yes No NA Yes :No NA =Yes No NA <br /> veriticd functional after testing? <br /> Comments— (include information on repairs madeprior!u fes tirrq=u�d rrcuuvrrervded Jollo,v-up/or Jailed!este) <br /> 11,111C enliru depth ul'lhe sump is not ic:ded. gwcik hmw much w,ts :,red. Iflhe :mswer to ur, of the yueslions uwwaled ,rich .ut <br /> n,lrruk( ") is "NU"or 'NA the -,nlire sump must be tested. (Sce SWRC'B LU-1601 <br />