Laserfiche WebLink
12. Handling of excavated soil: <br /> a) What material will be used to line and cover the tank & piping stockpile placed on the ground? <br /> �/I S f�y E�tJ vV�,AT6�!A L O� CDftn.pAT 16L E <br /> b) What will be the disposition of the tank & piping stockpile after analysis? <br /> CONTAM I tJLM2 1,501L, (A)11,,i,, B6 SANT To AQ f1,EPPOPPILM Dls Ej5AL s(T6 - <br /> rJOIU GoQTAMIuAr17 501L APsy 81= U5FD A5 8AGk-r-ICL o2 5f`tiT� <br /> A�J A(EP R-a�R ATS -2l5 M 5.Ad- 5 1 <br /> 13. What is the depth to groundwater? 4O1 "f t bLE INSTALL T I OtJ <br /> Describe the source of information: <br /> P(-�p Ap17L(1✓D GC-051J5TEK5 ReUIE W Ot= s ITr✓ <br /> 14. Are there any wells on this parcel or adjacent properties? YES [ ] NO [� <br /> TYPE OF WELLS DISTANCE TO TANKS(S) <br /> Public Well ft <br /> Private Well ft- <br /> Irrigation Well fL <br /> Monitoring Well ft <br /> ` Other ft <br /> 15. Will the tank(s) pending closure be replaced with an aboveground or underground storage tank(s) and has the <br /> responsible party submitted a "Letter of Commitment" to PHS/EHD? <br /> 5u7 n ITTEn AppocATldly I^bR Ftaizma To (IJLL U16 TA)QkS AQ12 c,I76 PLW- <br /> Page 6 <br /> closplan (Rev 4/22/91) wp <br />