My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
2300 - Underground Storage Tank Program
>
PR0231349
>
REMOVAL_1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2021 12:44:12 PM
Creation date
11/8/2018 10:23:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1991
RECORD_ID
PR0231349
PE
2361
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
01
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\K\KETTLEMAN\800\PR0231349\1991 REMOVAL.PDF
QuestysFileName
1991 REMOVAL
QuestysRecordDate
2/15/2018 7:41:32 PM
QuestysRecordID
3796137
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9.2 Street Work <br /> 9.2.1 All planned street work will be submitted to the safety <br /> officer a minimum of 72 hours prior to commencement of <br /> work. <br /> 9.2.2 The Safety Officer is responsible for formulating a <br /> traffic safety plan for the site <br /> 9.2.3 The Safety officer or Superintendent will physically <br /> check each site for street layout. <br /> 9.2.3.1 All digging/drilling locations should be marked <br /> at this time. <br /> 9.2.3.2 USA will be notified ASAP after marking. <br /> 9.2.3.3 If needed, no parking signs should be posted a <br /> minimum of 72 hours prior to commencement of <br /> work. <br /> 9.2.4 The traffic safety plan will include as a minimum: <br /> o map of location with excavation points marked. <br /> o lanes to be affected. <br /> o traffic control devices needed. <br /> 9.2.5 A traffic safety plan will be made for each site <br /> requiring regular monitoring and/or sampling of street <br /> wells. This plan will become a part of the work order. <br /> 9.2.6 Two persons are required for all street work requiring <br /> a traffic lane closure. Two men recommended for all <br /> other street work. <br /> 9.2.7 A red safety vest with reflective stripes will be worn <br /> by all personnel working in the street or by those <br /> crossing a street on regular basis to work. Hard hats <br /> are recommended while working in the street to provide <br /> additional protection and visibility to motorists. <br /> 9.2.8 The State of California Department of Transportation <br /> (CALTRANS) guidelines will be used as the traffic <br /> control guide unless specifically supplemented by local <br /> requirements. <br /> 9.2.9 No work in the street will commence until the affected <br /> lanes have been closed off and all traffic control <br /> devices are in place. <br /> 9.2.10 Vehicles should be parked so as to provide maximum <br /> protection for personnel. At least one vehicle must be <br /> equipped with a warning light other than hazard <br /> flashers. <br /> 9.2.11 All excavations in the street including parking areas <br /> will be covered by trench plates when practical. <br /> Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.