Laserfiche WebLink
'' `� eR e <br />STATE OF CALIFORNIA � i <br />STATE WATER RESOURCES CONTROL BOARD s4 r. <br />UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B �"� `° <br />p 'YID n. <br />�d <br />COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br />MARK ONLY ❑ 1 NEW PERMIT ❑ <br />3 RENEWAL PERMIT <br />CHANGE OF INFORMATION <br />❑ <br />7 PERMANENTLY CLOSED ONSITE <br />ONE ITEM ❑ 2 INTERIM PERMIT ❑ <br />4 AMENDED PERMIT <br />❑ 6 TEMPORARY TANK CLOSURE <br />❑ <br />8 TANK REMOVED / r <br />J <br />DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br />GASAHOL ❑ 7 METHANOL <br />L a f'Ai%p /� <br />CHEMICAL PRODUCT <br />L -, AA aP <br />I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br />A. OWNER'S TANK I.D.40'7 <br />MOTOR VEHICLE FUEL <br />�4 OIL <br />B. MANUFACTURED BY: <br />C. DATE INSTALLED (MOIDAV/YEAR) <br />❑ 3 DIESEL Ej 6 AVIATIONGAS <br />6 <br />D. TANK CAPACITY IN GALLONS: I (co <br />I <br />ILTANKCONTENTS IFA -11S MARKED -COMPLETE ITEM C. <br />A ❑ 1 <br />MOTOR VEHICLE FUEL <br />�4 OIL <br />B. <br />LAR <br />C. ❑ 1aUN <br />❑ 3 DIESEL Ej 6 AVIATIONGAS <br />O 2 <br />PETROLEUM <br />O 80 EMPTY <br />❑ 1 PRODUCT❑ <br />FADED <br />lbUN <br />GASAHOL ❑ 7 METHANOL <br />O 3 <br />CHEMICAL PRODUCT <br />O 95 UNKNOWN <br />WASTE <br />EAIDUM D <br />❑ 2 LEADED <br />❑ 5 JETFUEL <br />(Primary Tank) <br />❑ 9 BRONZE <br />O 10 GALVANIZED STEEL <br />�5 UNKNOWN <br />F --j 99 OTHER <br />�-99 OTHER (DESCRIBE IN ITEM D. BELOW) <br />D. IF (A.1) IS <br />NOT MARKED, ENTER NAME <br />OF SUBSTANCE STORED <br />0. 1 <br />C. INTERIOR <br />C. A. S. #: <br />III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B.AND C. AND ALL THAT APPLIES IN BOX D AND <br />A. TYPE OF <br />❑ 1 DOUBLE WALL <br />❑ 3 SINGLE WALL WITH EXTERIOR LINER <br />95 UNKNOWN <br />SYSTEM <br />❑ 2 SINGLE WALL <br />❑ 4 SECONDARY CONTAINMENT (VAULTEDTANK) <br />❑ 99 OTHER <br />B. TANK <br />❑ 1 BARE STEEL <br />❑ 2 STAINLESS STEEL <br />❑ 3 FIBERGLASS <br />❑ 4 STEEL CLAD W/ FIBERGLASS REINFORCED PLASTIC <br />MATERIAL <br />❑ 5 CONCRETE <br />❑ 6 POLYVINYL CHLORIDE <br />❑ 7 ALUMINUM <br />❑ 8 100% METHANOL COMPATIBLE W/FRP <br />(Primary Tank) <br />❑ 9 BRONZE <br />O 10 GALVANIZED STEEL <br />�5 UNKNOWN <br />F --j 99 OTHER <br />D. <br />O 1 RUBBER LINED <br />O 2 ALKYD LWING <br />a 3 EPDXY LINING <br />O 4 PHENOLIC LINING <br />C. INTERIOR <br />O 5 GLASS LINING <br />O 6 UNLINED <br />[?1'95 UNKNOWN <br />99 OTHER <br />LINING <br />IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? <br />YES_ NO— <br />D. CORROSION <br />❑ 1 POLYETHYLENE WRAP <br />❑ 2 COATING <br />❑ 3 VINYL WRAP <br />❑ 4 FIBERGLASS REINFORCED PLASTIC <br />PROTECTION <br />❑ 5 CATHODIC PROTECTION <br />❑ 91 NONE <br />95 UNKNOWN <br />❑ B9 OTHER <br />E. SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED (YEAR) <br />OVERFILL PREVENTION EQUIPMENT INSTALLED (YEAR) <br />IV. PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND. BOTH IF APPLICABLE <br />A. <br />I. <br />SYSTEM TYPE <br />A U <br />1 SUCTION <br />A U <br />2 PRESSURE p <br />GRAVITY <br />A U 99 OTHER <br />B. <br />CONSTRUCTION <br />A U <br />1 SINGLE WALL <br />A U <br />2 DOUBLE WALL A U <br />3 LINED TRENCH <br />A(( ;M UNKNOWN A U 99 OTHER <br />C. <br />MATERIAL AND <br />CORROSION <br />PROTECTION <br />A U <br />A U <br />A U <br />1 BARE STEEL <br />5 ALUMINUM <br />9 GALVANIZED STEEL <br />A U <br />A U <br />A U <br />2 STAINLESS STEEL A U <br />6 CONCRETE A U <br />10 CATHODIC PROTECTION <br />3 POLYVINYL CHLORIDE (PVC)A U 4 FIBERGLASS PIPE <br />7 STEEL W/ COATING A U B 100% METHANOL COMPATIBLE W/FRP <br />A )aS UNKNOWN A U 99 OTHER <br />D. <br />LEAK DETECTION <br />❑ 1 <br />AUTOMATIC LINE LEAK DETECTOR E2"2 LINE TIGHTNESS TESTING ❑ <br />MONITORING ❑ 99 OTHER <br />I. TANK LEAK DETECTION <br />121�1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br />❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br />1. ESTIMATED DATE LAST USED(MO/DAY/YR) 2. ESTIMATED QUANTITY OF 3. WAS TANK FILLED WITH YES ❑ NO❑ <br />SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br />TMS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY, AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br />APPLICANTS NAME DATE <br />(PRINTED 8 SIGNATURE) <br />LOCAL AGENCY USE ONLY THE STATE I.D. NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br />COUNTY # JURISDICTION # FACILITY # TANK # Or -SAL I y <br />STATE LD.# �1 1J1 01 Oil 16 3181 dL6 3 >f d 7 <br />PERMIT NUMBER PERMIT APPROVED BV/DATE PERMIT EXPIRATION DATE -9 /Z -T <br />FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION • FORM A, UNLESS A C RENT FORM A HAS BEEN FILED. <br />F/OR0031BR5 <br />�/ � � Ill <br />