Laserfiche WebLink
9-19-1996 2:01PM FROM RFL PETALUMA 7656836 P. 2 <br /> Date April 2(1 ]996 <br /> EMERGENCY RESPONSE PLAN <br /> UNDERGROUND STORAGE TANK MONTI'ORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. Tho information on this monitoring program aro <br /> conditions of tho opurating permit. The permit holder trust notify San Joaquin County <br /> Unvirunmental Health Division,phone(304)468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> Required by Sections 2632(d)and 2641(h)CCR. <br /> Facility Nance Ben-Holt / 1-5 Shell <br /> Facility Address 3011 W. Benjamin XQjt,..St kton <br /> 1. .If an unauthorized release occurs, how will the hazardous substance be cleaned up? <br /> Note: If released hazardous substances reach the environment, increase the fire or <br /> explosion hazard, are not cleaned up from the secondary containment within 8 <br /> hours, or deteriorate the secondary containment, then San Joaquin County <br /> Environmental Health Division, phone (209) 468-3420 must be notified. within 24 <br /> hours. Tor small spills the on site personnel will use absorbent material to clean uv the <br /> released material In the event of a larger. (ll thede4JAL—v�111 call <br /> his/her Shell Representative and the-Shgl]„F,,4gi,�tcc to assit the cmcrgCnQy. <br /> 2. Describe the proposed methods and equipment to be used for removing and properly <br /> disposing of any hazardous substances. <br /> u Spent absorbent will be placed into an s1proved container ang i sed of irl accordance <br /> with all Local State and Federal laws and regulations Any additional Nuipment will <br /> be provided be the re5nand Dg c<*ntractor <br /> 3. Describe the location and availability of the required cleanup equipment in item 2 above. <br /> Absorbent is maintained on site and restocked as needed. Ani additional equiprnen i <br /> maintained by the contractor, and available on an a$ needed bb3 <br /> 4. Describe the maintenance schedule for the cleanup equipment. <br /> Absorbent is ip$pected we My and reordered g needed <br /> S. List the name(s) and title(s) of the person(s) responsible for authorizing any work <br /> necessary under the response plan: <br /> SohnKendde (station DCaller . <br /> Jeff Granbc= / Shell Project Engineer <br /> Jeff Byrum / Shell District Eng-incer _ <br /> Dan Kirk / Shell gnviro�nt j��ggjn=r <br />