Laserfiche WebLink
1 <br /> EQUIPMENT DRYmFIT <br /> 1 - BEFORE INSTALLING PENETRATION FITTINGS <br /> - BEFORE CUTTING OPEN SUMP INTERSTICEv��' 9 �O <br /> 1 <br /> DRIP-FIT YOUR SUMP PIECES AND INTERNAL EQUIPMENTi g TB <br /> E.`�VI^DN"V77 �!Te^,L I- :ALTF <br /> 1 ��d—ray 0 wtc_O�T <br /> WARMING BEFORE PENETRATING FIBERGLASS <br /> 1 WALLS ENSURE THAT THE DOUBLE WALL FRP <br /> SUMP IS HOLDING VACUUM <br /> 1 It is REQUIRED to visually check the Vacuum gauge on each and <br /> every BravoSystems Double Wall product and unite on its packaging <br /> ' report Vacuum level, signature of observer, date and time the <br /> shipment is received at evely destination. <br /> 1 WARRANTY IS VOIDEn <br /> �Y <br /> IF ANY OF THE FOLLOWING OCCUR <br /> A) There is a failure to comply with the Required written report guidelines as stated above. <br /> 1 B) Double Wall Products are DOUBLE-STACKED, stored or shipped in a negligent way. <br /> There is a failure to handle Bravo Systems equipment with the utmost care. <br /> lo'_ i Any packaging or wrapping materials are removed before the item reaches It's destination. <br /> =� Double Wall Sump Products, Failure to call Bravo Systems If Vacuum level on product is <br /> h ' less than 12" HO (Vacuum) (323) 888-4133, refer to sump for further details. <br /> °) If there is any indication or suspect damage, you must mark the freight paperwork <br /> ).• k <br /> "Suspect Freight Damage" <br />