Laserfiche WebLink
' LjL!Mf.' While Fiberglassing, curing, or sitting overnight, keep the <br /> SVA-BARB in place. This will relieve stress on the Interstice <br /> ' while the sumps are heating up or cooling off. <br /> SAVE THESE PIECES, DO NOT LOSE THEMI Remove the SVA-BARB when ready to test. <br /> ' <br /> Gauge CAP SVA-BARB <br /> g <br /> Assembly <br /> PRIMARY LINE PENETRATION FITTINGS � " T `° r,, <br /> A.6 - Install all the required number of doublewall penetration fittings p t1� lr respective <br /> Installation Instructions (Fig. A.4). JAN 18 2018 <br /> �. i-i <br /> E,,!`j I�ONi�?r^ �.'� <br /> � ' , '�AI_TH <br /> ' Fmwi DO NOT FILL DOUBLE WALL PENETRATION latuRL <br /> FITTINGS WITH FOREIGN MATERIALS, SEALANTS or R6)ktjVAjT <br /> ' ELECTRICAL FITTINGS & CONDUITS <br /> A.7 - Next generation Bravo UDC's feature an electrical offset frame that allows you to install your <br /> ' conduits on the exterior of the sump and up into the side panel of your dispenser. <br /> A.8 - Following your installation of the doublewall penetration fittings, you must <br /> ' FIRST TEST THE INTEGRITY OF THE BOX, SINCE THE INITIAL VACUUM HAS BEEN LOST. <br /> A.9 - Using the factory-provided & installed pressure/vacuum combination gauge, Pressure the <br /> sump to 4 PSI and soap ALL fittings, and any field repairs, inside and outside. If foaming leaks are <br /> found, Skip to Step B.2. <br /> PRIMARY AND SECONDARY PIPING <br /> ' A.1® - Please refer to your pipe manufacturer's Installation Instructions. <br /> A.11 - When finished with the installation of pipe lines, pressure sump again to no more than a <br /> PSI and soap all penetration fittings, inside and outside. Again, if leaks are found, skip to Step B.2 <br /> ' S. Bravo Systems, Inc. Highly recommends the Air <br /> �► Integrity Test (Step B,40 to be completed at this time, after <br /> the penetration rings ha¢ h yen Metz-iied c-orractly. <br /> ii-B8000-9000-DW=`I1 B <br />