My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
2300 - Underground Storage Tank Program
>
PR0231532
>
INSTALL_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2021 10:24:33 AM
Creation date
11/8/2018 10:24:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0231532
PE
2351
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
01
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS3\C\CAMBRIDGE\16470\PR0231532\INSTALL 2018.PDF
QuestysFileName
INSTALL 2018
QuestysRecordDate
7/2/2018 8:57:03 PM
QuestysRecordID
3932889
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' B8000/B9000 DoubleWall Dispenser Containment <br /> F - ADJUSTING THE PRODUCT SHEAR VALVE <br /> JAi\1 /2-018 <br /> UNION <br /> - L F-i-: TH <br /> s^•� f,, //1'•'' ! i Fri `ti L'•t <br /> 40 <br /> tale <br /> col•a <br /> 1 i .ti <br /> Boss mount bolts <br /> WIDTHWISE ADJUSTMENT:+1- 318" <br /> J4 ,Irl 3/8" Bolts <br /> U Bolt Bracket Not Shown <br /> F.1 - When the dispenser is anchored properly, the dispenser inlet or pump inlet should be plumb <br /> with the product shear valve. If the product shear valves are positioned correctly, connect them with <br /> a union. <br /> F.2 - If the valve and inlet are not aligned, determine the distance necessary for the valve to be <br /> moved. To adjust the valve lengthwise and/or widthwise, loosen the 3/8" bolts on the bracket ends <br /> and on the bracket inserts. Align valve to dispenser inlet and retighten bolts. <br /> ' F.3 - Connect dispenser riser pipe to the product shear valve. A nipple may be required to extend <br /> the dispenser riser. <br /> ' � For rigid piping apply a UL classified pipe sealant for use and handling <br /> of gasoline and petroleum oils to externally threaded connections. <br /> FA - Now retighten bolts and/or nuts attaching the shear valves to the bracket. Use provided wash- <br /> ers. <br /> F.5 - Connect electrical and vapor lines to the dispenser as required by local regulations. <br /> Always follow electrical and vapor component manufacturers' Installation Instructions. <br /> ' 13 ii-B8000-9000-DW-11B <br />
The URL can be used to link to this page
Your browser does not support the video tag.