My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
2300 - Underground Storage Tank Program
>
PR0231532
>
INSTALL_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2021 10:24:33 AM
Creation date
11/8/2018 10:24:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0231532
PE
2351
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
01
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS3\C\CAMBRIDGE\16470\PR0231532\INSTALL 2018.PDF
QuestysFileName
INSTALL 2018
QuestysRecordDate
7/2/2018 8:57:03 PM
QuestysRecordID
3932889
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VAPOR VENT INSTALLATION INSTRUCTIONS <br /> A - VENT BO P SITIONING Fig. A.2 Finish Floor <br /> A.i - Determine the permanent position of the n-� <br /> UniVent according to your specs. During 3 = <br /> positioning, leave the access cover dry-fit to the ` <br /> to of the vent box. Rest the Vent Box lightly on a <br /> p g Y <br /> ' bed of peagravel while you position it and make it <br /> level. ' <br /> �E $ <br /> THE TOP OF ACCESS COVER111,�4[flip7h MI <br /> (WHEN DRY - FIT) NEEDS TO BE: <br /> FOR 6500 VENT Box - 2 INCHES ABOVE THE FINISH FEeOOR <br /> Install Vapor Pipe.a i <br /> $ Fig. B.3 <br /> FOR B600 VENT Box - 'I INCH ABOVE THE FINISH FLOOR ` <br /> - 13.4 <br /> ' A.2 - Using leveling stakes, stake the target area for a a <br /> vent box to be set and frame or scaffold the box into a <br /> permanent fixed position allowing access to front end <br /> ' of box for penetration fitting installation and to prevent —any shifting or movement prior to pouring of concrete. <br /> (Fig. A.2) <br /> Install <br /> MAKE SURE VENT Box is PLUMB Penetrations <br /> Flit * j VERTICALLY AND LEVEL FOR CLEAN Fig. B.1 <br /> ' RACK SYSTEM INSTALlation. <br /> B - PENETRATION FITTINGS <br /> Remove Access C <br /> B.� - v A ss over from Vent Box set aside. <br /> ' Install required number of penetration fittings <br /> ONLY (Fig. B.1). <br /> IT IS RECOMMENDED THAT YOU AB W. ; T <br /> s * " WALLS FLAT ER THE T-FS-SANQ- IT N :T L TION <br /> ' INSTRUCTIONS JAN 18 2018 <br /> .2 - Install the required number of electrical penetrations and connec�gR�I7,ONM -",JT;'\L. HEALTH <br /> .3 - Please refer to your pipe manufacturer's (nstal(ation Instructions to instal=ydb`r°p�lm��i <br /> piping and vent lines. (Fig. 8,3) <br /> ' RA ® The Compression Fittings are Factory Installed. The Compression Gasket is also <br /> ,ire-greased by the factory. When Installing vent risers you must fit the Compression Gasket over <br /> the pipe, (Fig. B.4) down onto the Compression Fitting, and thread over the Compression Nut. <br /> Use the Bravo Compression nut tool (Part No. WR-3) to torque down the compression nut <br /> 1/4 to 1/2 turns past hand-tight. <br /> 3 ii-6500/600-SW-12A <br />
The URL can be used to link to this page
Your browser does not support the video tag.